Power facilities ahead of the island, over 35 kV and 110 kV cable 2 to cross the harbor and the provincial power grid and network.
岛上电力设施建设超前,拥35千伏和110千伏二条过海电缆,并与省电网并网。
Plugged network cable or a cross to the local connection?
插好网线本地连接还是打叉?
Plugged network cable or a cross to the local connection?
插好网线本地连接还是打叉?
应用推荐