This paper studies the so called two-stage cross docking logistics scheduling problem and its algorithms.
本文主要研究两阶段越库物流作业调度问题及其算法设计。
This paper considers the cross docking distribution scheduling problem, with the objective to minimize the total weighted completion times.
提出并研究两台机器环境下的以带权总完工时间为目标函数的越库配送排序问题。
The paper studies the schedule problem of cross docking distribution in the situation of two machines, which objective function is the total weighted completion time.
主要研究两台机器环境下的以加权完工时间和为目标函数的越库调度问题。
The paper studies the schedule problem of cross docking distribution in the situation of two machines, which objective function is the total weighted completion time.
主要研究两台机器环境下的以加权完工时间和为目标函数的越库调度问题。
应用推荐