Although I have reduced the risk of bottlenecks and provided some additional lead time to the critical path, I haven't added any time to the overall project plan.
虽然我已经降低瓶径的风险并在关键路径上提供了一些额外的时间,但是我在整个项目计划中没有增加时间。
Profiler results help you identify the critical path of your application; that is, the code that is executed most of the time.
分析器结果可以帮助标识应用程序的关键路径;即大部分时间所执行的代码。
We allow an additional time buffer associated with the critical path, and not the other tasks.
我们允许一个在关键路径上添加附加时间来进行缓冲,但并不是在某一任务中添加时间。
A critical code path is one that takes a long time to process or is very frequently executed.
关键代码路径是处理时间长或频繁执行的代码路径。
Note that without resource considerations, the length of time through the critical path is nine days (longest time through the various sequential steps).
注意到如果不考虑资源,通过关键路径的时间是9天(通过各种各样顺序排列的步骤所需的最长时间)。
The tradeoff between these two strategies often comes down to a simple question of time versus money--which is the critical path for you in terms of reaching "big" status.
两种模式的权衡通常可以归结为一个简单的资金和时间的问题,也就是说为了实现目标,哪种模式更适合你。
Critical path is useful in regression testing and other severely time-constrained testing.
关键路径在回归测试和其它有严格时间控制的测试中十分有用。
According to critical path method and serial scheduling, a schema was discussed for computing time parameters of transitive predecessors and transitive successors.
根据关键路径法和串行调度原理,论述了先序活动和后序活动时间参数计算的方法,并以实例阐述了计算原理。
After enough turns of simulation, the distribution of the total work period can be determined, at the same time the critical path can be found in the probability concept.
对大量仿真计算结果进行统计分析,可以得到总工期及关键路线的概率分布结果,为施工管理提供更多的信息。
In this text, it mainly introduces the application of the fuzzy theory in network planning, and the calculation method of the fuzzy time-parameter, confirmation of the fuzzy "critical path" (CP).
本文主要介绍网络计划中模糊理论的运用及时间参数作为模糊变量的计算方法和模糊网络关键线路的确定。
It's brought forward an EVM evaluation method with critical path to hold the project progress well through comparing with BCWP and BCWS also with BCWP CP and BCWS CP in critical path at the same time.
本文提出了一种带关键路径的挣值法评价方法,在比较分析BCWP与BCWS的同时对关键路径上的BCWP与BCWS作比较,以便更准确地把握项目进度情况。
The Lagrangian formulation of the critical dynamics is recovered in the second order approximation of fluctuations in the closed time path continuous integral.
在闭路连续积分中取涨落二级近似,得到临界动力学的拉氏场论表述。
Critical path scheduling was one of the earliest applications of computers in construction, but it took quite a long time for it to gain wide acceptance.
计划关键路线是计算机在建筑行业中最早的用途之一,不过经过了很长一段时间,这一方法才得以广泛承认。
The new method quantifies the time parameters with L-R triangular fuzzy number, and identifies the critical path through ranking method of fuzzy number.
新方法将L-R三角模糊数引入到网络时间参数计算,并且采用模糊数大小排序的方法确定关键线路。
By elaborating the knowledge hierarchy of Project Management, and time Management theory, the article explains Critical Path method of managing time, and how to apply the method.
本文通过对项目管理知识体系和项目时间管理理论的阐述,详细介绍了时间管理中关键路径的理论和使用方法。
This paper analyzes the time-scaled network plan applied to confirm critical path, gain time factors, control network plan and so on.
就时标网络计划在工程中如何确定关键线路、分析工作时间参数、进行网络计划的控制等进行阐述。
A weighted critical path algorithm was provided to calculate the expectation value of the workflow's duration, record the process of reduction, and identify the time-oriented critical path.
通过加权关键路径算法,可以计算工作流完成时间的期望值及记录约简过程中的中间结果,从而确定工作流模型的关键路径。
Finally, an engineering project application case is analyzed to illustrate the whole process of Earned Value management based on the reward and penalty system of time and the critical path.
最后,本文通过一个工程项目案例具体演示基于工期奖罚制度与关键路径的挣值管理的使用过程。
The article introduces the method of the critica1 path, confirms the limited time of a project through confirming the critical path and finds out critical activity of the project to shorten time.
文章介绍了确定关键路径的方法,通过确定关键路径以确定工程的工期并找出关键活动以缩短工期。
Total lead time for an end item, calculated by taking the individual lead times for all items on the critical path through all levels of the bill of material.
最终产品的总共前置时间,以物料清单各层要径所有产品前置时间计算得出。
At the same time, compute all the path criticalities by utilizing the relationship between the critical path of interval networks and the path criticality of the fuzzy network as well.
同时利用截集区间网络关键路径与模糊网络关键度的关系,计算出所有路径的关键度。
So the scope of project for subcontracting canbedlvlded by sub network. The network wlthcoordlnates of time that should be the main managing program can be drawn by sub critical path.
子网络图还为工程分包提供了计划依据,因此可以根据子网络图来划分工程分包的范围。
So the scope of project for subcontracting canbedlvlded by sub network. The network wlthcoordlnates of time that should be the main managing program can be drawn by sub critical path.
子网络图还为工程分包提供了计划依据,因此可以根据子网络图来划分工程分包的范围。
应用推荐