• Then some critical parts of the system should be reverse-engineered and the migration path to the new platform validated.

    然后应该系统一些关键部分逆向工程,并且验证平台移植路径

    youdao

  • First of all, the paper USES work Load Point assessment system, work breakdown structure and critical path method to build the control and monitor system based on the work Load Point system.

    首先本文运用工作负荷系统评估系统、项目分解结构以及关键路线构建基于工作负荷点系统的进度度量监控体系

    youdao

  • Business leaders use a system called Critical Path Analysis to plan large-scale business projects.

    商业领导者通常使用关键路径分析制定大型商业项目的计划。

    youdao

  • Combined with improved algorithm, the engagement critical path of networked Air Defense System with target was calculated.

    以此模型为基础,利用改进关键路径算法,得到网络化防空作战系统目标对抗过程中的关键路径;

    youdao

  • Finally, an engineering project application case is analyzed to illustrate the whole process of Earned Value management based on the reward and penalty system of time and the critical path.

    最后本文通过一个工程项目案例具体演示基于工期奖罚制度关键路径管理使用过程

    youdao

  • Finally, an engineering project application case is analyzed to illustrate the whole process of Earned Value management based on the reward and penalty system of time and the critical path.

    最后本文通过一个工程项目案例具体演示基于工期奖罚制度关键路径管理使用过程

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定