This paper also designs the computerized critical path algorithm and the network graph drawing algorithm based on the graph theory and project management technique.
论述了图论的技术以及项目管理技术,并且根据图论技术和项目管理技术设计出了关键路径算法以及网络图绘制算法。
This paper also designs the computerized critical path algorithm and the network graph drawing algorithm based on the graph theory and project management technique.
由于本系统以网络图的形式进行工程管理,因此提供了一个简单、直观制作网络图的平台。
A weighted critical path algorithm was provided to calculate the expectation value of the workflow's duration, record the process of reduction, and identify the time-oriented critical path.
通过加权关键路径算法,可以计算工作流完成时间的期望值及记录约简过程中的中间结果,从而确定工作流模型的关键路径。
This paper presents the algorithm of acquiring the primary critical path.
本文论述了求解主关键路径的算法。
After studying conditions for generating PODCM in the critical path of data flow graph (DFG), an algorithm was introduced to produce PODCM.
通过分析在数据流图(DFG)关键路径上生成PODCM的条件,给出了在DF G关键路径上生成PODCM的算法并建立了PODCM库。
Combined with improved algorithm, the engagement critical path of networked Air Defense System with target was calculated.
以此模型为基础,利用改进的关键路径算法,得到网络化防空作战系统与目标对抗过程中的关键路径;
Then a detailed ASIC design of the SHA-1 algorithm module is given, whose logic on the longest critical path is optimized.
随后给出了SHA - 1算法模块的详细ASIC设计,优化了SHA - 1模块最长关键路径上的逻辑结构。
Then we present a scheduled critical path based algorithm.
接下来我们提出基于调度关键路径算法。
The verification automaton and the algorithm for abstracting critical path are proposed to verify high level synthesis process automatically.
为了便于自动验证高层综合过程,给出了验证自动机模型。
The verification automaton and the algorithm for abstracting critical path are proposed to verify high level synthesis process automatically.
为了便于自动验证高层综合过程,给出了验证自动机模型。
应用推荐