What about dependencies and critical path analysis?
依赖和关键路径分析如何去做?
This places the "orange" resource on the critical path.
这就在关键路径上放置了一个“桔红色”资源。
Using MQ to get risky operations off the critical path.
使用MQ以从关键路径去除风险大的操作。
As this title suggests, these features determine the critical path.
如此题目所暗示的,这些特性确定了关键的路径。
Hardware architecture and critical path analysis are also introduced.
给出了硬件结构图及关键路径分析。
Show the critical path for your project to quickly find problem tasks.
显示项目的关键路径:以快速查找有问题的任务。
The improved lifting scheme is adopted to reduce the critical path delay.
采用改进的提升算法,减少了关键路径上的延时。
This paper presents the algorithm of acquiring the primary critical path.
本文论述了求解主关键路径的算法。
This method of analysis is commonly known as the Critical Path method (CPM).
该分析方法通常被称为关键路线法(Critical Path Method (CPM))。
The simplest approach to test case prioritization is identification of critical path.
最简单的处理测试用例优先权的方法是关键路径的识别。
Critical path is useful in regression testing and other severely time-constrained testing.
关键路径在回归测试和其它有严格时间控制的测试中十分有用。
We allow an additional time buffer associated with the critical path, and not the other tasks.
我们允许一个在关键路径上添加附加时间来进行缓冲,但并不是在某一任务中添加时间。
Business leaders use a system called Critical Path Analysis to plan large-scale business projects.
商业领导者通常使用关键路径分析来制定大型商业项目的计划。
Because of the decreased critical path delay, the conversion can be implemented in a single cycle.
关键路径延时的减小,使这一转换可以在单周期内完成。
This 20% of code is on the "critical path" and it is these areas that are worth optimizing for performance.
这20%的代码位于“关键路径”上,正是这些方面值得进行性能优化。
If not, determine the critical path and look for ways to accelerate these activities to get you back on track.
若否,找出关键路径,并寻找到加速执行相关工作的办法以便能让你重回正轨。
This paper proposes a fault simulation method called Critical Path Tracing of Multi-Fault Information Flag.
提出了一种故障模拟方法——多故障信息标志的临界路径跟踪。
If an activity on the critical path is a week late, you can't sit idly and allow the entire project to be a week late.
如果处在关键路径上的某个活动延期了一周,你可不能傻坐着眼看整个项目延期一周。
Profiler results help you identify the critical path of your application; that is, the code that is executed most of the time.
分析器结果可以帮助标识应用程序的关键路径;即大部分时间所执行的代码。
"Always test the user Activation flow" : be absolutely sure your user's "critical path towards initial gratification" is working.
“必须测试用户激活流程”绝对要保证让用户“初步满足的关键路径”是起作用的。
Knowledge of process variation is important to optimize critical path delay, minimize clock skew, and reduce crosstalk noise.
过程变化的知识对于最优化电路延时,减少时钟倾斜和降低串扰噪声很重要。
As the number of taps of filter increases, the structure can be easily extended without increasing the delay of critical path.
随着抽头数量的增长,此结构很容易扩展,且不会增加关键路径的延时。
Maybe we don't need continuous critical path analysis, but we still have specialists that are not permanently dedicated to the team.
或许我们不必持续地做关键路径的分析,但是我们仍然有专家并非永久致力于团队。
You will review each of the activities on the critical path and identify the potential risks that could put your schedule in jeopardy.
你会检查关键路径上的每一格活动,并识别可能破坏进度的风险。
In our original waterfall project we had a critical path that aligned key activities in our project with key activities in their project.
在我们初始的瀑布法项目中,我们有了一个关键路径,将我们的项目中的关键活动与其它项目中的关键活动关联在一起。
In the process of scheduling and adjusting, the operator nodes both in critical path and non-critical path can be dealt simultaneously.
该方法在调度和调整过程中,可以同时处理关键通路和非关键通路上的节点。
In the process of scheduling and adjusting, the operator nodes both in critical path and non-critical path can be dealt simultaneously.
该方法在调度和调整过程中,可以同时处理关键通路和非关键通路上的节点。