The new method quantifies the time parameters with L-R triangular fuzzy number, and identifies the critical path through ranking method of fuzzy number.
新方法将L-R三角模糊数引入到网络时间参数计算,并且采用模糊数大小排序的方法确定关键线路。
The new method quantifies the time parameters with L-R triangular fuzzy number, and identifies the critical path through ranking method of fuzzy number.
新方法将L-R三角模糊数引入到网络时间参数计算,并且采用模糊数大小排序的方法确定关键线路。
应用推荐