Backup criteria: Specifies when automatic backup should consider scheduling a backup.
备份条件:指定自动备份应在何时计划备份。
Scheduling is to assign some tasks to time resources under some constraints, such that one- or multi-criteria attain to the optimum.
所谓排序,就是在一定的约束条件下分配时间资源去完成一些任务,使一个或多个目标达到最优。
Performance criteria of production scheduling system was divided into two categories: equipment-associated criteria (EAC) and job-associated criteria (JAC).
将调度系统性能指标分为设备关联指标和工件关联指标。
Performance criteria of production scheduling system was divided into two categories: equipment-associated criteria (EAC) and job-associated criteria (JAC).
将调度系统性能指标分为设备关联指标和工件关联指标。
应用推荐