The paper introduces the schedule and cost control during the execution of QHD 32 - 6 oil field development in detail. Comments on how to handle such controls are also given.
阐述秦皇岛32-6油田开发工程进度和费用控制的具体措施,并对做好进度和费用控制工作提出了建议。
At last a case study is presented in detail to illustrate the process of risk estimation of the combined schedule-cost risk.
最后结合算例说明了进度-费用联合风险的定量估计方法。
At last a case study is presented in detail to illustrate the process of risk estimation of the combined schedule-cost risk.
最后结合算例说明了进度-费用联合风险的定量估计方法。