In armament acquisition system, cost risk and the elements that had an impact on are interaction.
在武器装备采办系统中,费用风险以及影响费用风险的要素之间是相互作用的。
The research object of this paper is cost risk, to study and manage the risk in large engineering cost management.
文章研究的目标是成本风险,对大型工程成本管理过程中存在的风险进行研究和管理。
At last a case study is presented in detail to illustrate the process of risk estimation of the combined schedule-cost risk.
最后结合算例说明了进度-费用联合风险的定量估计方法。
In view of existing cost risk factor and according to utility theory, the paper form the risk degree standard for different project stages.
针对造价风险因素,根据效用理论建立各阶段的风险度评价标准。
The other risk is the difficulty of adopting low-cost risk control strategy because of multiplying interests body, which put emphasis on coordination.
另外虚拟企业的关系风险因多利益体的原因而难以采用低成本的风险控制策略,更多的是强调协调。
The paper classifies all the risk factors and makes the whole evaluation of cost risk in different stages, through all kinds of risk evaluation methods.
运用多种风险评估方法,对可度量的造价风险进行了归类整理度量,对各阶段的造价风险作整体评价。
The general evaluation is done mainly in the three respects of real estate cost risk analyses, development funding risk analyses, financial risk and policy risk analyses.
主要从房地产成本风险分析、房地产开发筹资风险分析、金融风险与政策性风险分析三个方面对该项目进行了综合评述。
For the sake of effective risk management, it firstly analyzes the risk content and finds out the difficulty, then it establishes a cost risk manage system and points out key problems.
为了有效地对费用风险进行管理,文章首先对费用风险内容进行分析,找出费用风险管理的难点,建立了费用风险管理系统,并指出了此系统实施时的关键问题。
Also, the enterprise out sources the it system to the specialized enterprise, but reduces the opportunity to study the information technology, that is enterprise's opportunity cost risk.
还有就是企业把IT系统外包给专业的企业,而减少了企业学习信息技术的机会,同样也是企业的机会成本风险。
Nevertheless, there are some actions that offer much and carry little risk or cost.
尽管如此,还是有一些措施能够带来很多好处,同时,风险和成本也较低。
She noted, many young people are especially risk averse at school—afraid that one low test score or mediocre grade could cost them a spot at a selective university.
她指出,许多年轻人尤其不愿意在学校冒险,担心一次考试的分数低或成绩差会让他们失去进入名牌大学的机会。
Before, they might not insure the ones who felt like a high risk or charge them too much, or they would charge them too little and then it would cost the company money.
此前,他们可能不会为那些觉得风险高的人投保或收取他们太多的费用,又或者他们收取的费用太低,然后给公司带来损失。
Be hyperconservative when it comes to downside risk, hyperaggressive when it comes to opportunities that cost you very little.
当出现滑坡风险时要极其保守,当需要极少资金投入的机会出现时要十分积极主动。
In any case he declares that point as a "risk." Not a cost.
在任何情况下,他都把那个点声明为“风险,而不是成本。”
Project management: Cost, schedule, risk, staffing, and so forth.
项目管理:成本、时间表、风险、人员分配等等。
This bulk discount helps the cloud computing provider plan for capacity demands and therefore minimizes the cost and risk of on-demand instances.
这些折扣会帮助云计算供应商规划容量需求,从而将按需实例的成本和风险降到最低。
Since 2000, however, the cost of risk capital has gone up in spite of dramatically falling interest rates.
然而自从2000年以来,随着利率不断大幅下降,风险资本成本一路上升。
You reduce risk and cut cost, without jeopardizing data retention compliance.
您可以在降低风险和节约成本的同时保护数据。
This adds the needed function without significantly altering the original code, possibly with lower cost and less risk.
这就要添加所需的功能,但并不对原始代码进行大幅度修改,成本和风险可能更低。
It's not the cheapest proposition, and cost containment alone will not offset the cost and risk of migrating to new systems.
这不是一个廉价的议题,而且成本的限制将不能抵消移植到新系统的风险成本。
Understanding and gaining agreement on project objectives, deliverables, scope, risk, cost, approach, etc.
理解项目目标、可交付物、范围、风险、成本、方法并且达成一致。
Outsourcing firms are moving into more countries in order to deliver the right mix of cost, risk and quality.
为了达到成本,风险,质量的正确组合,外包公司进驻越来越多的国家。
Approaches for creating a test environment vary in cost, planning, and risk.
创建一个测试环境的各种方法的成本、规划和风险都不相同。
Third, it would come at minimum cost and risk to the taxpayer.
第三,纳税者承担的成本和风险应该最小。
Risk management practitioners must weigh the potential cost to the company should the risk be realized against the cost of managing the risk and the associated opportunity costs.
风险管理人员必须权衡风险发生时可能发生的成本和对风险及相关机会成本进行管理所需的成本。
And lower interest rates won't do the trick, as they won't bring down the cost of risk capital.
此外,低利率也无法解决问题,因为它们无法降低风险资本的成本。
Logistics: Just like TNT, the best transportation networks are optimized for both cost and risk, and consider multiple routes to markets and contingency shipping plans.
物流:正如TNT所做的那样,最好的运输网络应同时考虑到成本和风险,并兼顾通向目标市场的多线路选择和偶然事件下的发货计划。
It helps speed development and reduce cost and risk by reusing assets and artifacts to solve recurring problems.
这样可通过重用资产和构件来解决重复出现的问题,从而帮助提高开发速度和减少成本和风险。
It helps speed development and reduce cost and risk by reusing assets and artifacts to solve recurring problems.
这样可通过重用资产和构件来解决重复出现的问题,从而帮助提高开发速度和减少成本和风险。
应用推荐