To control the engineering quality cost control, the following work should be carried out: quality cost projection, plan, accounting, analysis, assessment and report.
开展工程质量成本控制,应做好质量成本预测、计划、核算、分析、考核和报告等工作。
According to the current phenomenon of low item cost, the paper analyses the item cost management from three aspects: cost projection, cost control and the effective measures of reducing cost.
针对目前项目造价偏低的现象,从成本预测、成本控制、降低成本的有效途径三方面分析项目成本管理。
According to the current phenomenon of low item cost, the paper analyses the item cost management from three aspects: cost projection, cost control and the effective measures of reducing cost.
针对目前项目造价偏低的现象,从成本预测、成本控制、降低成本的有效途径三方面分析项目成本管理。
应用推荐