The benefits for companies deploying SOA include business flexibility and cost optimization.
企业部署SOA的收益包括业务灵活性与成本优化。
In the current economic climate, the immediate need for and value of database performance cost optimization and tuning cannot be overstated.
在当今的经济环境中,数据库性能和成本优化的重要性和价值怎么强调也不过分。
Observation of BOM cost, design-to-cost optimization.
关注BOM成本, 设计到成本的最优化。
At last, it studies the fuzzy duration-cost optimization of decision network planning.
最后,对模糊决策网络计划工期—成本优化方法进行了探讨。
A new method is provided for the function parameter design and cost optimization of the development of weapon systems.
结果表明该方法可行,为武器装备研制的性能参数设计和费用优化提供了一种新方法。
According to the construction cost plan, cost program evaluation and time-cost optimization are used to control the project cost.
根据施工项目的成本计划,运用成本计划评审法和时间成本优化法对项目成本进行控制。
This article introduces the thought and method of highway engineering time-cost optimization, and puts forward the CAD software design scheme.
介绍了公路工期—成本优化的思路和方法,并提出了公路工程工期—成本优化的CAD软件设计方案。
As to optimization of the network technique, make emphasis on "time-cost optimization" and set up mathematic model using Linear Scheduling method.
在进度计划的优化方法方面,仅以“工期-成本优化”为例,用线形规划方法建立了求解模型。
Due to the iterative property of such algorithm, there arises the issues of optimizations, including algorithmic optimization and cost optimization.
但相应算法本质上是迭代性的,这样一来就又存在一个优化的问题,包括算法本身的优化与实现开销的优化两方面。
Based on logistics cost optimization, the procedure of SM-CC is analyzed, and a model of order grouping is suggested and performed by self-adaptated GA.
计算结果表明,混合钢铁流程炼钢-连铸 浇次组合与排序计划算法是有效的,该算法已运用于生产实际,具有推广价值。
Then a new decision model is established to solve the cost optimization problem of DCs location for chain enterprise, in order to afford decision support.
基于库存的优化,建立了新的决策模型来解决连锁企业的配送中心选址的成本最优化问题,以期为连锁企业的配送中心选址提供决策支持。
For this purpose, this paper presents a reuse cost optimization oriented, locality principle and instance set decomposition based component refactoring method.
为此,提出一种面向复用成本优化的、基于局部性原理与实例集分解的构件重构方法。
At present, the study of the time-cost optimization is generally in the CPM network, and the traditional CPM network is not in line with the actual situation of the project.
目前,时间-费用优化问题的研究一般是在CPM网络中进行的,传统的CPM网络不符合项目进行过程中的实际情况。
The paper applies ant colony algorithm to network planning time-cost optimization problems, thereby getting a accurate, comprehensive and efficient solution optimization method.
文章将蚁群算法应用于计划调度的工期-费用优化问题之中,得到一种精确、全面,求解效率高的优化方法。
The GERT network can solve not only the project time optimization problem in making bridge construction plan, but also the cost optimization in the limit of proper project time and resource.
随机网络不仅可以解决桥梁施工计划的工期优化问题,而且在合理工期和限定资源条件下,可进行施工成本优化。
Procurement is the crucial link of project cost optimization. The successful purchasing behavior that not only comes from in buying side more relies on the procurement control of high level.
采购是工程项目成本优化的关键环节,成功的采购不仅来自于采购方的采购行为,更依赖于高水平的采购管理。
The time value of capital in schedule cost optimization and the influence of the income of running period to schedule cost optimization of engineering project is mainly studied in this paper.
本文重点研究了工程项目建设期进度费用优化中资金的时间价值以及工程项目运营收益对项目建设期进度费用优化的影响。
Simulation results indicate that the result of total aircraft delay cost optimization is satisfactory and application of the a algorithm to the aircraft sequencing in terminal area is feasible.
结果表明,航班总延误成本的优化结果是令人满意的,A算法在终端区飞机排序问题中的应用是可行的。
Simulation results indicate that the result of total aircraft delay cost optimization is satisfactory and application of the a algorithm to the aircraft sequencing in terminal area is feasible.
结果表明,航班总延误成本的优化结果是令人满意的,A算法在终端区飞机排序问题中的应用是可行的。
应用推荐