A cost baseline is an output of which cost management process?
项目成本基准是哪个过程的输出?
In this article, project cost management process, analyze the problems and discuss and put forward corresponding countermeasures.
本文针对工程项目成本管理过程中存在的问题进行分析和探讨并提出相应的对策。
The end of paper suggest that the implement of FGS (Suzhou) Company's cost management process can be divided into three steps to get good performance.
本文最后提出将FGS(苏州)公司成本管理的实施分为三个阶段进行。
They cover both process and project lifecycles and carefully address vital issues ranging from scope and time to cost management and stakeholder communication.
他们既涉及到了过程和项目生命周期,而且还仔细阐述了从范围到时间,乃至成本管理和利益关系者们的交流的重要问题。
ECM Widgets can significantly reduce the cost of implementation for enterprise business process management.
ECMWidgets可以有效降低实现企业业务流程管理的成本。
IBM BPM BlueWorks is an upcoming set of cloud-based business process management (BPM) tools and content to help you get started with BPM quickly and easily — and at no cost.
IBMBPMBlueWorks是一组即将面世的基于云的业务流程管理(BPM)工具和内容,旨在帮助您快速轻松地上手bpm——并且无需成本。
In the case of static analysis, most of the information is extracted from the model and used to analyze cost, time management, performance, process flow validity, and resource leveling.
在静态分析中,大多数信息是从模型中提取出来的,并用于分析消耗、时间管理、性能、流程有效性及资源水平。
Depending on business requirements, the timesheet application could be seen in light of an organizational payroll process or in combination with a cost-breakdown-structure for product management.
依靠商业需求,时间表应用程序可以看成组织的薪水册程序或者与成本细目分类结构结合用于产品管理。
The management and control of cost for a construction project are a dynamic process.
工程造价的控制与管理是一个动态的过程。
Evaluate the layout, production capacity; lead the process improvement, cost down project. Support the management data to production manager.
进行有关工厂布局、设备产能和工艺改进、降低费用的研究,并为管理层提供数据。
Garment cutting process is an important part of production, directly related to the enterprise cost management and production efficiency.
服装裁剪工艺是企业生产的重要环节,直接关系到企业的成本管理和生产效益。
So in the project management process, we must strengthen the management and cost control.
所以在项目管理过程中,我们要加强对成本的管理与控制。
The cost management of project management department is an important part in that of the whole process of construction engineering.
项目经理部的成本管理是整个建筑施工过程成本管理的重要一环。
The article introduced how to reduce quality cost by applying quality management theory and method to improve rate of qualified of resistors painting process in QC team activity.
本文介绍了利用QC小组开展活动,运用质量管理的理论和方法,提高电阻器生产过程中涂漆工序的合格率,降低了质量成本。
Assist inventory management, optimize inventory check, and cost check process.
协助进行存货管理,优化存货核算、成本核算流程。
Cost management is the process of enterprise production cost accounting, cost analysis, cost and cost control and so on a series of decision-making science management behavior.
成本管理是指企业生产经营过程中各项成本核算、成本分析、成本决策和成本控制等一系列科学管理行为的总称。
Project cost management is a complex system engineering. It is a dynamic process.
项目成本管理是一个复杂的系统工程,是一个动态管理过程。
Strengthens the maintenance of equipment in the management process, reduces the managed cost, raises the economic efficiency.
在经营过程中加强设备维护,降低管理成本,提高经济效益。
At the same time, the paper USES "dynamic ability" theory to stress that the process of cost management promoting depends on the environmental factors and its history.
同时,论文引入“动态能力”理论,强调企业成本管理推进过程中的环境依赖和惯性特征。
At the same time, the service industry in the process management idea, can help the enterprise to realize the service refinement of management, effective control and the cost of the service process.
同时,服务工单中的流程管理思想,可帮助企业实现服务精细化的管理,以及对服务过程产生的成本有效控制。
The project cost control and management is a dynamic process.
工程造价的控制与管理是一个动态的过程。
The third chapter mainly analyses the currently status of company a based on logistics process, information management, logistics cost and vender management and point out the problem.
论文第三章从运作流程,信息流管理,物流成本和供应商管理等几个方面就A公司目前的情况进行全面详细的分析,并指出了问题所在。
This article discusses the issue, which exist in the process of management of materials with how to enhance the cost control of engineering materials.
文章就当前施工项目工程材料成本管理中存在的问题及如何加强工程材料成本控制进行了探讨。
Abstract: : the engineering cost management is a very complicated process, from design to the final accounts of the final review exploration, each stage has its own characteristics.
摘要:工程造价的管理是一个很复杂的过程,从勘查设计到最终决算审核,每个阶段都有其特点。
How to apply plan management, process management, control of cost of software engineering are studied in the middle and small software development enterprises.
研究了软件工程项目计划管理、项目进度管理、成本控制技术在中小软件开发企业中如何应用。
Take the effective management of the whole process of the project cost control is the key.
采取有效的全过程工程造价的管理控制是关键。
Total cost management is a method of cost management orienting the 21st century. At present, it consists of total process, total factor, total risk and total team management.
全面造价管理是面向21世纪的造价管理方法,目前它是集全过程、全要素、全风险和全团队为一体的造价管理。
This paper focuses on the construction process of engineering cost control and management of its function discussed.
本文主要对工程建设过程中工程造价控制和管理工作对其起到的作用进行了探讨。
Through the analysis of the process management and control of construction cost, the article works out the focal points and contents as well as the main methods for this work.
文章通过对工程造价全过程管理控制的分析论述,找出对工程造价全过程管理控制的重点及内容、主要方法等,旨在实现造价全过程控制。
The management to these materials will affect directly project cost and process.
这类项目的物料管理会直接影响项目成本和工程进度。
应用推荐