• A cost estimate at a given stage of project development represents a prediction provided by the cost engineer or estimator on the basis of available data.

    项目开发过程中的某一特定阶段成本估算就是造价工程师现有数据基础上对未来成本的预测

    youdao

  • More than 5 years' experience in on-site drainage and electricity engineer, familiar with the project budget and settlement, possesses the qualification of above cost engineer ;

    从事施工现场水电工程师岗位5以上熟悉专业工程结算工作,持有造价员以上执行资格;

    youdao

  • Company employees 1826, 426 professional and technical personnel, of which 155 middle and senior technical staff economist who, 12 140 construction manager, cost engineer 5, accountants 4.

    公司现有职工1826名,专业技术人员426名,其中高中级技术经济师人员155,一二级建造师140名,造价5名,会计师4名。

    youdao

  • Anyone who has obtained a qualification certificate shall not engage in engineering cost activities in the name of a certified cost engineer until he has completed the registration formalities.

    取得注册证书执业印章人员,不得以注册造价工程师名义从事工程造价活动

    youdao

  • A study by the Rand Corporation found that "a doubling in the number of [nuclear] reactors [built by an architect-engineer] results in a 5% reduction in both construction time and capital cost".

    兰德公司(RandCorporation)研究发现,“(建筑工程师)制造()反应堆数量增加倍,所需的制造时间资金成本下降5%。”

    youdao

  • Upon receiving this notice, the Engineer shall proceed in accordance with Sub-Clause 3.5 [Determinations] to agree or determine this cost, which shall be included in the Contract Price.

    接到通知后工程师依据第3 . 5【决定】,对此费用作出商定决定加入合同价格。

    youdao

  • In this paper, we introduce the conception of project life cycle cost management and basic theory of value engineer.

    引入工程项目生命周期费用管理概念,介绍了价值工程的基本原理

    youdao

  • The chief engineer on the team developing the technology says it will cost about half what foreign systems do.

    开发这项技术的团队工程师,线路的造价大约国外系统一半左右

    youdao

  • Lengthy meetings with the structural engineer eventually provided the most cost effective solution.

    我们结构工程师进行了冗长会谈最终提出成本效益解决方案

    youdao

  • Using the NIBCO 1022 enables the balancing Engineer to carry out system balancing as accurately and efficiently as possible, reducing time and cost on site.

    采用尼必可1022,平衡工程师能够尽可能精确有效实现系统平衡,减少现场时间成本

    youdao

  • The Principal engineer is responsible to obtain product cost approval from the top management.

    首席工程师负责最高管理层处获得生产成本认可

    youdao

  • The Process Engineer reports to the Engineering Manager, and is responsible for maintaining on-going processes and developing new processes to meet product goals of quality, delivery and cost.

    职位工程部经理汇报负责维护产品改善生产工艺达到质量标准,准时交货成本控制

    youdao

  • When the Engineer instructs for trimming to improve the appearance, the consequential cost shall be borne by the Contractor.

    为了获得满意外观质量,监理工程师认为必要进行修整,其费用承包人负责

    youdao

  • One of the key functions of a quality Engineer is the reduction of the total cost of quality associated with a product.

    作为质量检验工程师其中重要职能就是减少一个产品的质量成本

    youdao

  • The system of pipeline corrosion detection was beneficial for engineer to monitor the corrosion status of buried pipeline and save the maintenance cost.

    管道腐蚀检测系统有利于工程师监测埋地管道腐蚀情况节省管道维护开销

    youdao

  • Technological advantages: an engineer and technician team with rich experience in CAD, mould making, thermal forming and with the three top goals for" quality, speed and cost".

    技术优势拥有一支经验丰富计算机CAD辅助设计模具制作成型加工的专业工程师技师队伍,永创“质量速度、成本”三个一流

    youdao

  • A hierarchy conceptual model of the armor protection of engineer equipment was constructed and the method of analyzing and calculating its cost and effectiveness was proposed.

    构建了工程装备战场防护层次概念模型,提出了一种装备战场防护费用防护效果的分析计算方法

    youdao

  • Support process engineer to plan the process about choosing tools, cutting parameter and cost;

    刀具选型加工参数经济性方面支持工艺工程师进行工艺规划

    youdao

  • Secondly, this paper analyzed the existing problems in Wuan irrigated district currently and accounted the water cost price of water supply engineer in the Tenth Branch Canal.

    分析五岸灌区十支渠现行水价存在的问题,十支渠水利供水工程例测算成本水价。

    youdao

  • The KMI mission is to engineer, design and build paint & porcelain enamel finishing systems at a reasonable cost and within the project schedule.

    KMI公司策划、设计生产喷漆釉表层瓷漆系统价格合理,保证项目计划时间完成。

    youdao

  • S series Linear Shaft motor allows the design engineer the ultimate in flexibility to match the applications requirements with the most cost effective motors.

    系列电机也允许设计人员使用低成本电机灵活匹配应用需求

    youdao

  • Abstract: construction project cost management includes cost management of project preparatory work, of construction process and of engineer settlement.

    [摘要]建设项目成本管理包括项目前期工作成本管理、建设过程成本管理工程结算成本管理。

    youdao

  • Our high qualified engineer and after-sale team will supply you the best automatic plan and service, high-quality, high efficiency, high cost effective products to improve your productivity.

    公司高素质工程师售后服务团队企业提供最佳的整体自动化方案服务,提供品质、高效率性价比的自动化产品提升业界的生产效率和品质。

    youdao

  • If the Contractor fails to give the notice, he shall, if and when required by the Engineer, uncover the work and thereafter reinstate and make good, all at the Contractor's cost.

    如果承包商发出此类通知工程师要求打开部分工程随后自费恢复原状,使之完好

    youdao

  • If the Contractor fails to give the notice, he shall, if and when required by the Engineer, uncover the work and thereafter reinstate and make good, all at the Contractor's cost.

    如果承包商发出此类通知工程师要求打开部分工程随后自费恢复原状,使之完好

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定