• The difference of economical performances between a Shanghai diesel powered and a CNG powered bus is investigated by using life cycle cost assessment method (prices in 2003).

    利用生命周期成本评估方法上海市柴油CNG公交车经济性能进行了评价(2003年价格)。

    youdao

  • Theories of quality cost management are expounded. A calculating method to determine the optimum values of quality cost and the assessment of quality cost economic results are explored.

    本文论述了质量成本管理理论探讨了质量成本最佳求法质量成本管理经济效益评价

    youdao

  • A method for software cost estimation and risk assessment is presented in this paper.

    论文提出一种用于软件成本估计以及风险评估方法

    youdao

  • A general method of reliability cost assessment in distribution system which is based on Semi-Markov process and aims at the uncertainty of failure duration distribution is presented.

    针对配电系统故障时间分布不确定特点,提出了基于马尔柯过程可靠性成本评估通用方法

    youdao

  • To improve the actuality of present value of future profit method on technical asset assessment, the thesis analyzes the method and modifies it with current replacement cost.

    本文融合技术型资产重置成本评估,对现有收益现值法进行修正,使其更为符合现实情况。

    youdao

  • The method of mining rights assessment is similar to the method of other asset assessment, which evaluates the value of target by return, market and cost.

    文章指出,矿业权评估方法其它资产评估方法相似之处,也是通过收益、市场和成本三个途径对评估对象价值进行评价和估算的。

    youdao

  • The analytical method of the cost, the important method while appraising that is the public policy, in the already general assessment applied to the policy.

    本钱分析方法公共政策评价中的重要方法,已经普遍运用于政策的评估中。

    youdao

  • Contingent valuation method (CVM) and travel cost method (TCM) now dominate these assessment studies, however the appraisal value content is actually different.

    条件价值旅行成本当前较多采用的森林游憩资源价值评价方法,评价价值内容不同

    youdao

  • The proposed method provides a scientific and reliable means for the risk assessment of shield tunnel construction cost.

    方法盾构隧道施工成本风险评估提供了一种科学可靠手段

    youdao

  • Risk assessment is the most cost-effective method in dam safety management.

    水坝风险管理经济有效的水坝安全管理方法

    youdao

  • Risk assessment is the most cost-effective method in dam safety management.

    水坝风险管理经济有效的水坝安全管理方法

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定