The monthly cost analysis report, the recovery of the project funds, cost effective control.
审定月度成本分析报表,对各项工程资金的回收、开支进行有效控制。
Implement and redevelop cost center and cost accounting control and provide cost analysis report.
完成并再开发成本中心和成本核算控制,并提供成本分析报告。
Check material voucher and delivery voucher, transfer related voucher at the end of month, cost check, workout cost analysis report.
材料的入库、出库审核,月末相关帐务结转、成本核算,编制成本分析报告。
Responsible for budget analysis method and review the cost analysis report, and come up with the corresponding countermeasures according to the results of the analysis.
负责制定预算分析办法并审核费用分析报告,并根据分析结果提出相应对策。
Dynamic Analysis - process Comparison Analysis - process cost Comparison. In this report (Figure 46) you can see that the resource costs are over 30% lower for the To-Be version of the process.
动态分析-流程对比分析-流程成本对比——在这一报告中(图46),您可以看出,流程的将来版本节省的资源成本超过30%。
Dynamic Analysis - process Comparison Analysis - process cost Comparison. This report (Figure 52) shows a much lower cost for the To-Be version of the process.
动态分析-流程对比分析-流程成本对比——这一报告(图52)显示了流程的将来版本的成本要低得多。
Dynamic Analysis - Process Comparison Analysis - Process cost Comparison a "From this report (Figure 5), you see that avoiding the high cost path saves money."
动态分析-流程对比分析-流程成本对比——在这一报告(图5)中,您可以看出避免高成本路径可以节省资金。
Assist in setting up the project cost follow-up report, according to the projects financial management, prepare the monthly analysis for variation.
根据项目财务管理要求,协助部门经理建立项目成本跟踪报告,按月分析,报告差异。
In this report, acquisition activity is taken as an example to practice the cost and benefit analysis in the company.
在这份报告中,以收购活动为例,分析公司的成本效益。
Making report to CEO directly with responsibilities of cash flow, budget, financial report inspection and approval and cost analysis.
直接对CEO汇报,负责现金流、预算、财务报表的审阅和审批及成本分析。
The fourth part recommends how to carry on analysis, report, predicting, plans, and examines to the quality cost.
第四部分介绍如何对质量成本进行分析、报告、预测、计划和考核。
To control the engineering quality cost control, the following work should be carried out: quality cost projection, plan, accounting, analysis, assessment and report.
开展工程质量成本控制,应做好质量成本预测、计划、核算、分析、考核和报告等工作。
This report is the analysis of the youngest airlines companies of Low Cost Carriers (LCC) Tiger Airways's marketng strategy.
本报告是分析最年轻的航空公司低成本航空公司(LCC)老虎航空公司的行销策略。
The system can automatically account, seek and analyze the data of quality cost. The results of analysis can print out by the report of quality cost.
该系统实现了质量成本数据的自动核算、查询与分析,分析的结果以质量成本报告的形式输出;
In the construction of the project database module, the thesis has carried on the detailed decomposition to a construction cost report, mainly from the Angle of construction cost analysis.
在构建项目数据库的模块中,本文主要从造价分析的角度,对一份造价报告书进行了详细的分解。
2 prepare tax report, draft tax cost forecast and analysis report, declare tax;
编制税收报表,草拟税务成本预测和分析报告,申报纳税;
Share and report regularly and accurately to GM and relevant department about sales information, cost control, revenue analysis.
定期、准确向酒店总经理和相关部门提供有关销售情况、费用控制情况、销售收入等信息。
Results The accurate cost-accounting report and benefit analysis report for equipment were created.
结果:产生准确的成本核算数据和设备效益分析。
Results The accurate cost-accounting report and benefit analysis report for equipment were created.
结果:产生准确的成本核算数据和设备效益分析。
应用推荐