A study by the Rand Corporation found that "a doubling in the number of [nuclear] reactors [built by an architect-engineer] results in a 5% reduction in both construction time and capital cost".
兰德公司(RandCorporation)的研究发现,“(建筑工程师)制造的(核)反应堆数量增加一倍,所需的制造时间和资金成本下降5%。”
A cost estimate at a given stage of project development represents a prediction provided by the cost engineer or estimator on the basis of available data.
在项目开发过程中的某一特定阶段的成本估算就是造价工程师在现有数据基础上对未来成本的预测。
In this paper, we introduce the conception of project life cycle cost management and basic theory of value engineer.
引入工程项目全生命周期费用管理的概念,介绍了价值工程的基本原理。
The chief engineer on the team developing the technology says it will cost about half what foreign systems do.
开发这项技术的团队总工程师说,线路的造价大约是国外系统的一半左右。
Lengthy meetings with the structural engineer eventually provided the most cost effective solution.
我们与结构工程师进行了冗长的会谈,最终提出最具成本效益的解决方案。
Using the NIBCO 1022 enables the balancing Engineer to carry out system balancing as accurately and efficiently as possible, reducing time and cost on site.
采用尼必可1022,平衡工程师就能够尽可能精确和有效的实现系统平衡,减少现场的时间和成本。
The Principal engineer is responsible to obtain product cost approval from the top management.
首席工程师负责从最高管理层处获得生产成本认可。
When the Engineer instructs for trimming to improve the appearance, the consequential cost shall be borne by the Contractor.
为了获得满意的外观质量,监理工程师认为有必要进行修整时,其费用由承包人负责。
Upon receiving this notice, the Engineer shall proceed in accordance with Sub-Clause 3.5 [Determinations] to agree or determine this cost, which shall be included in the Contract Price.
在接到通知后,工程师应依据第3 . 5款【决定】,对此费用作出商定或决定,并将之加入合同价格。
One of the key functions of a quality Engineer is the reduction of the total cost of quality associated with a product.
作为一个质量检验工程师的其中一个重要的职能就是减少一个产品的质量成本。
While this period, I took part in the cultivating of supervision, cost member, engineer, the certification of manager's safe production and so on. And I got the relevant qualification.
在此期间,参加过监理岗位培训、造价员、工程师、厂长经理安全生产资格等培训,并获得相应的资格。
The system of pipeline corrosion detection was beneficial for engineer to monitor the corrosion status of buried pipeline and save the maintenance cost.
管道腐蚀检测系统有利于工程师监测埋地管道腐蚀情况,节省管道维护开销。
Technological advantages: an engineer and technician team with rich experience in CAD, mould making, thermal forming and with the three top goals for" quality, speed and cost".
技术优势:拥有一支经验丰富的计算机CAD辅助设计、模具制作、热成型加工的专业工程师和技师队伍,永创“质量、速度、成本”三个一流。
A hierarchy conceptual model of the armor protection of engineer equipment was constructed and the method of analyzing and calculating its cost and effectiveness was proposed.
构建了工程装备战场防护的层次概念模型,提出了一种装备战场防护费用和防护效果的分析计算方法。
Support process engineer to plan the process about choosing tools, cutting parameter and cost;
从刀具选型、加工参数和经济性方面支持工艺工程师进行工艺规划;
How to play supervision engineer in project cost management role talk about some experience.
就如何发挥监理工程师在工程造价管理的作用谈一些体会。
Anyone who has obtained a qualification certificate shall not engage in engineering cost activities in the name of a certified cost engineer until he has completed the registration formalities.
未取得注册证书和执业印章的人员,不得以注册造价工程师的名义从事工程造价活动。
Secondly, this paper analyzed the existing problems in Wuan irrigated district currently and accounted the water cost price of water supply engineer in the Tenth Branch Canal.
分析五岸灌区十支渠现行水价存在的问题,以十支渠水利供水工程为例测算成本水价。
The Process Engineer reports to the Engineering Manager, and is responsible for maintaining on-going processes and developing new processes to meet product goals of quality, delivery and cost.
本职位向工程部经理汇报,负责维护产品制程和改善生产工艺以达到质量标准,准时交货和成本控制。
The KMI mission is to engineer, design and build paint & porcelain enamel finishing systems at a reasonable cost and within the project schedule.
KMI公司策划、设计和生产喷漆和瓷釉表层瓷漆系统,价格合理,保证在项目计划时间内完成。
Presently because of the service need, invites face the society oversees engineer, construction cost engineer, the tender teacher proper name, looks at fellow men of insight's joined.
现因业务需要,面向社会诚聘监理工程师、造价工程师、招标师数名,望各位有识之士的加入。
S series Linear Shaft motor allows the design engineer the ultimate in flexibility to match the applications requirements with the most cost effective motors.
系列电机也允许设计人员,使用低成本的电机,灵活匹配应用需求。
To be an excellent cost engineer, civil engineers need at least 3 years of practice after graduated from college, and a excellent project manager need special requirements on growth time and line.
从大学毕业到成为一名优秀的造价师、土建工程师至少需要3年的实践经验,而一名优秀的项目经理的成长时间和成长路线更是有着特殊的要求。
Abstract: construction project cost management includes cost management of project preparatory work, of construction process and of engineer settlement.
[摘要]建设项目成本管理包括项目前期工作成本管理、建设过程成本管理和工程结算成本管理。
It focus on key personnel of project management and engineering classes, such as project managers, technical director, cost engineer, and civil engineers.
流动率高的人才集中在工程管理和工程技术类的关键性人才,如项目经理、技术总监、造价师和土建工程师等。
It focus on key personnel of project management and engineering classes, such as project managers, technical director, cost engineer, and civil engineers.
流动率高的人才集中在工程管理和工程技术类的关键性人才,如项目经理、技术总监、造价师和土建工程师等。
应用推荐