• A study by the Rand Corporation found that "a doubling in the number of [nuclear] reactors [built by an architect-engineer] results in a 5% reduction in both construction time and capital cost".

    兰德公司(RandCorporation)研究发现,“(建筑工程师)制造()反应堆数量增加倍,所需的制造时间资金成本下降5%。”

    youdao

  • A cost estimate at a given stage of project development represents a prediction provided by the cost engineer or estimator on the basis of available data.

    项目开发过程中的某一特定阶段成本估算就是造价工程师现有数据基础上对未来成本的预测

    youdao

  • In this paper, we introduce the conception of project life cycle cost management and basic theory of value engineer.

    引入工程项目生命周期费用管理概念,介绍了价值工程的基本原理

    youdao

  • The chief engineer on the team developing the technology says it will cost about half what foreign systems do.

    开发这项技术的团队工程师,线路的造价大约国外系统一半左右

    youdao

  • Lengthy meetings with the structural engineer eventually provided the most cost effective solution.

    我们结构工程师进行了冗长会谈最终提出成本效益解决方案

    youdao

  • Using the NIBCO 1022 enables the balancing Engineer to carry out system balancing as accurately and efficiently as possible, reducing time and cost on site.

    采用尼必可1022,平衡工程师能够尽可能精确有效实现系统平衡,减少现场时间成本

    youdao

  • The Principal engineer is responsible to obtain product cost approval from the top management.

    首席工程师负责最高管理层处获得生产成本认可

    youdao

  • When the Engineer instructs for trimming to improve the appearance, the consequential cost shall be borne by the Contractor.

    为了获得满意外观质量,监理工程师认为必要进行修整,其费用承包人负责

    youdao

  • Upon receiving this notice, the Engineer shall proceed in accordance with Sub-Clause 3.5 [Determinations] to agree or determine this cost, which shall be included in the Contract Price.

    接到通知后工程师依据第3 . 5【决定】,对此费用作出商定决定加入合同价格。

    youdao

  • One of the key functions of a quality Engineer is the reduction of the total cost of quality associated with a product.

    作为质量检验工程师其中重要职能就是减少一个产品的质量成本

    youdao

  • While this period, I took part in the cultivating of supervision, cost member, engineer, the certification of manager's safe production and so on. And I got the relevant qualification.

    期间参加监理岗位培训造价工程师厂长经理安全生产资格培训,获得相应资格。

    youdao

  • The system of pipeline corrosion detection was beneficial for engineer to monitor the corrosion status of buried pipeline and save the maintenance cost.

    管道腐蚀检测系统有利于工程师监测埋地管道腐蚀情况节省管道维护开销

    youdao

  • Technological advantages: an engineer and technician team with rich experience in CAD, mould making, thermal forming and with the three top goals for" quality, speed and cost".

    技术优势拥有一支经验丰富计算机CAD辅助设计模具制作成型加工的专业工程师技师队伍,永创“质量速度、成本”三个一流

    youdao

  • A hierarchy conceptual model of the armor protection of engineer equipment was constructed and the method of analyzing and calculating its cost and effectiveness was proposed.

    构建了工程装备战场防护层次概念模型,提出了一种装备战场防护费用防护效果的分析计算方法

    youdao

  • Support process engineer to plan the process about choosing tools, cutting parameter and cost;

    刀具选型加工参数经济性方面支持工艺工程师进行工艺规划

    youdao

  • How to play supervision engineer in project cost management role talk about some experience.

    如何发挥监理工程师工程造价管理作用一些体会

    youdao

  • Anyone who has obtained a qualification certificate shall not engage in engineering cost activities in the name of a certified cost engineer until he has completed the registration formalities.

    取得注册证书执业印章人员,不得以注册造价工程师名义从事工程造价活动

    youdao

  • Secondly, this paper analyzed the existing problems in Wuan irrigated district currently and accounted the water cost price of water supply engineer in the Tenth Branch Canal.

    分析五岸灌区十支渠现行水价存在的问题,十支渠水利供水工程例测算成本水价。

    youdao

  • The Process Engineer reports to the Engineering Manager, and is responsible for maintaining on-going processes and developing new processes to meet product goals of quality, delivery and cost.

    职位工程部经理汇报负责维护产品改善生产工艺达到质量标准,准时交货成本控制

    youdao

  • The KMI mission is to engineer, design and build paint & porcelain enamel finishing systems at a reasonable cost and within the project schedule.

    KMI公司策划、设计生产喷漆釉表层瓷漆系统价格合理,保证项目计划时间完成。

    youdao

  • Presently because of the service need, invites face the society oversees engineer, construction cost engineer, the tender teacher proper name, looks at fellow men of insight's joined.

    业务需要面向社会诚聘监理工程师造价工程师、招标各位有识之士加入

    youdao

  • S series Linear Shaft motor allows the design engineer the ultimate in flexibility to match the applications requirements with the most cost effective motors.

    系列电机也允许设计人员使用低成本电机灵活匹配应用需求

    youdao

  • To be an excellent cost engineer, civil engineers need at least 3 years of practice after graduated from college, and a excellent project manager need special requirements on growth time and line.

    大学毕业成为优秀造价土建工程师至少需要3实践经验名优秀的项目经理成长时间成长路线更是有着特殊要求

    youdao

  • Abstract: construction project cost management includes cost management of project preparatory work, of construction process and of engineer settlement.

    [摘要]建设项目成本管理包括项目前期工作成本管理、建设过程成本管理工程结算成本管理。

    youdao

  • It focus on key personnel of project management and engineering classes, such as project managers, technical director, cost engineer, and civil engineers.

    流动率高人才集中工程管理工程技术类关键性人才,项目经理技术总监造价师和土建工程师等。

    youdao

  • It focus on key personnel of project management and engineering classes, such as project managers, technical director, cost engineer, and civil engineers.

    流动率高人才集中工程管理工程技术类关键性人才,项目经理技术总监造价师和土建工程师等。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定