• The method of changing the pile length to control the correct position rate was raised in the paper. This method can solve the problem of pile length in the construction.

    提出用变桩长方法控制混凝土桩的正位率,以解决施工中存在的桩长问题。

    youdao

  • The method of changing the pile length to control the correct position rate was raised in the paper. This method can solve the problem of pile length in the construction.

    提出用变桩长方法控制混凝土桩的正位率,以解决施工中存在的桩长问题。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定