The coordinating control system and the pre commissioning operation of the Waigaoqiao Power Plant's No. 2 unit are described.
介绍了外高桥电厂2号机组的协调控制系统方式及试运情况,运行状况良好。
The coordinating control system and the pre commissioning operation of the Waigaoqiao Power Plant's No. 2 unit are described.
介绍了外高桥电厂2号机组的协调控制系统方式及试运情况,运行状况良好。
应用推荐