• Technology and method of effectively controlling engineering cost are put forward through all construction process.

    提出工程建设全过程中有效制约工程造价技术策略

    youdao

  • Therefore, the retaining and protection structure of excavation should be properly optimized for the purpose of controlling engineering cost.

    因此,设计支护结构偏安全,不利于控制工程成本根据工程实际情况进行适当优化

    youdao

  • For whole and effective controlling engineering cost it is needful to implement all process control to three sections of influence engineering cost.

    完整有效地控制工程造价,应对影响工程造价三个阶段实施全过程控制

    youdao

  • This article makes an exploration of controlling the engineering cost through implementing the internal budget by the enterprise.

    此文就施工企业实行内部预算工程成本控制,进行探讨。

    youdao

  • This paper makes an exploration into the method and significance of controlling highway engineering cost by using the value analysis.

    此文就此探讨应用价值分析,控制公路工程成本方法意义

    youdao

  • The paper discussed the quality cost principle and methods of controlling engineering quality cost.

    阐述质量成本原理控制工程质量成本方法

    youdao

  • The rational controlling of engineering cost and saving construction capital are more and more paid attention by investors in engineering construction process.

    工程建设过程合理控制工程造价节约建设资金越来越投资者重视和关注。

    youdao

  • The management of engineering cost should be carried on according to principles of proper, certain and effective controlling.

    工程造价管理本着合理确定有效控制原则

    youdao

  • Highway engineering is an integer, and the supervision is carried out according to the controlling of compact quality, schedule and cost.

    公路工程一个整体,公路工程监理是围绕合同管理进行质量进度、费用的有效控制

    youdao

  • Through the analysis of the relationship of engineering design stage and engineering overall cost, some concrete measures of controlling the engineering design stage cost runaway are put forward.

    通过分析工程设计阶段工程总体造价关系工程设计阶段造价失控的原因,提出一些具体控制措施

    youdao

  • Through the analysis of the relationship of engineering design stage and engineering overall cost, some concrete measures of controlling the engineering design stage cost runaway are put forward.

    通过分析工程设计阶段工程总体造价关系工程设计阶段造价失控的原因,提出一些具体控制措施