• Technology and method of effectively controlling engineering cost are put forward through all construction process.

    提出工程建设全过程中,有效制约工程造价的技术和策略。

    youdao

  • Therefore, the retaining and protection structure of excavation should be properly optimized for the purpose of controlling engineering cost.

    因此,设计的支护结构均偏安全,不利于控制工程成本,应根据工程实际情况进行适当优化。

    youdao

  • For whole and effective controlling engineering cost it is needful to implement all process control to three sections of influence engineering cost.

    为完整而有效地控制工程造价,应对影响工程造价的三个阶段实施全过程控制。

    youdao

  • This article makes an exploration of controlling the engineering cost through implementing the internal budget by the enterprise.

    此文就施工企业实行内部预算对工程成本的控制,进行了探讨。

    youdao

  • This paper makes an exploration into the method and significance of controlling highway engineering cost by using the value analysis.

    此文就此探讨了应用价值分析,控制公路工程成本的方法和意义。

    youdao

  • The paper discussed the quality cost principle and methods of controlling engineering quality cost.

    阐述了质量成本原理及控制工程质量成本方法。

    youdao

  • The rational controlling of engineering cost and saving construction capital are more and more paid attention by investors in engineering construction process.

    工程建设过程中,合理的控制工程造价和节约建设资金越来越为投资者所重视和关注。

    youdao

  • The management of engineering cost should be carried on according to principles of proper, certain and effective controlling.

    工程造价的管理应本着合理确定、有效控制的原则。

    youdao

  • Highway engineering is an integer, and the supervision is carried out according to the controlling of compact quality, schedule and cost.

    公路工程是一个整体,公路工程监理是围绕合同管理进行的质量、进度、费用的有效控制。

    youdao

  • Through the analysis of the relationship of engineering design stage and engineering overall cost, some concrete measures of controlling the engineering design stage cost runaway are put forward.

    通过分析工程设计阶段与工程总体造价的关系,对工程设计阶段造价失控的原因,提出一些具体的控制措施。

    youdao

  • Through the analysis of the relationship of engineering design stage and engineering overall cost, some concrete measures of controlling the engineering design stage cost runaway are put forward.

    通过分析工程设计阶段与工程总体造价的关系,对工程设计阶段造价失控的原因,提出一些具体的控制措施。

    youdao