Two controlled circulation boilers were installed in Dagang Power Plant technique updating engineering. Chemical cleaning was achieved before start of the boiler unit.
大港发电厂技改工程安装两台强制循环汽包锅炉,机组启动前进行了化学清洗。
The pressure parts construction, design criteria of water wall, calculation procedure of water circulation and selection of critical parameters for controlled circulation boiler are introduced.
介绍了控制循环锅炉的结构特点,水冷壁等系统的设计准则,水循环系统设计的计算步骤及设计中关键数据的选取。
The pressure parts construction, design criteria of water wall, calculation procedure of water circulation and selection of critical parameters for controlled circulation boiler are introduced.
介绍了控制循环锅炉的结构特点,水冷壁等系统的设计准则,水循环系统设计的计算步骤及设计中关键数据的选取。
应用推荐