• To control the project schedule and ensure the quality.

    确保项目进度质量

    youdao

  • The influence assessment for thermal power plant construction projects is helpful to control the project risks.

    火电厂建设项目影响评价有利于控制项目风险

    youdao

  • According to the construction cost plan, cost program evaluation and time-cost optimization are used to control the project cost.

    根据施工项目成本计划,运用成本计划评审时间成本优化法对项目成本进行控制

    youdao

  • The cost control in the construction phase is the key whether the construction enterprises can effectively control the project cost.

    建筑施工企业能否有效控制项目成本关键控制施工阶段的成本。

    youdao

  • In project management, if people want to organize, command, coordinate and control the project scientifically, they must communicate.

    而在项目管理中,实现科学地组织指挥协调控制项目,必须进行信息沟通

    youdao

  • The key of low cost strategy for a petroleum engineering project is to effectively control the project progress, its cost and quality.

    石油工程项目实施成本战略关键项目进度、成本质量进行有效地控制

    youdao

  • The net has been modeled on the mountain, following its shape. Using this simple grid helped the architects to better control the project.

    网格模仿山体形状使用一简单网格有助于建筑师更好地这个项目

    youdao

  • Thus, we will have a better way to control the project cost and lower the risk of contract management and improve the benefit of fixed assets also.

    同时将在设计管理、招投标管理、合同管理、施工管理领域管理水平提高产生深远的意义。

    youdao

  • This article analyses and compares the problems existing in the cost control of the early stage, and it discusses a solution to control the project cost effectively.

    本文分析比较了当前我们住宅建设前期造价控制阶段存在问题,针对这些问题提出了相应的解决方法更好、有效地控制工程造价提出了意见建议。

    youdao

  • In order to achieve the due goal of construction quality, this paper discusses how a client can control the project in design, supervising and construction respectively.

    设计监理施工三个方面论述了建设项目业主如何对建设项目实行质量控制,保证工程质量达到预期目标

    youdao

  • From the cause of project change, this paper analyses the influences of project change over municipal engineering cost and how to control the project change of municipal engineering well.

    工程变更产生原因出发,分析了工程变更市政工程造价影响,提出了加强市政工程变更有效控制的措施。

    youdao

  • How to optimize the design in order to reduce or control the project cost was described, several measures to control costs in the design phase of rural highway construction were proposed.

    阐述了如何优化设计降低控制工程造价提出农村公路建设中设计阶段控制造价几点措施

    youdao

  • Notice how the phases for the control project sometimes end a little later than the corresponding phases of the projects it manages.

    注意对于这个控制项目阶段有时候是如何管理相应阶段一些结束的。

    youdao

  • The project will now be added to source control.

    项目现在添加控制之中

    youdao

  • The control project, however, is different from a normal project in that most of the real work of the stage occurs in the sub-projects coordinated by the control project.

    然而控制项目常见项目不同的,常见项目中这个阶段的绝大多数实际工作发生在伴随有控制项目子项目中。

    youdao

  • Project managers just get in the way and try to take control of the project away from the product manager.

    项目经理只是一帮碍事的人,成天想着产品经理手里夺走项目控制权

    youdao

  • While we at QUT will continue to be heavily involved in the project, we plan to transfer full control and ownership of the project to the open source community.

    尽管我们QUT(昆士兰理工大学)团队继续深入参与项目当中,但是我们计划将项目完全控制权所有权转交开源社区

    youdao

  • Project administrators can control the format for saving documents and enable the extended editing function for the project.

    项目管理人员可以控制这个版式,从而用来保存文档激活项目扩展编辑功能

    youdao

  • As the architecture stabilizes, additional projects in the stage are initiated and overseen by the control project.

    由于稳定这个构架,这个阶段中的附加项目就会控制项目启动检查。

    youdao

  • Introducing this control project also enables the results from sub-projects to be rolled-up to the program level.

    引入这个控制项目能够使来自子项目结果累积计划水平

    youdao

  • Cost and earned value: To maintain control over expenditures throughout the project lifecycle.

    成本盈利为了维护对整个项目周期开销控制

    youdao

  • Click OK to finish adding the project to source control.

    点击OK完成源代码控制添加项目的操作。

    youdao

  • Recently, we had a project due at the end of the month, but due to "scope creep" that was outside our control on another initiative, the project had to be delayed.

    最近我们一个本月底到期项目由于范围蔓延超出我们其他行动控制项目不得不延迟

    youdao

  • RUP adds structure to an agile approach by focusing on driving out requirements uncertainty early and tightening process control naturally as the project progresses toward completion.

    RUP通过早期逐出需求不确定性结构添加一个敏捷方法中,并且随着项目的不断推进很自然地绷紧了处理过程控制

    youdao

  • For example, the risks and issues from the sub-projects would be consolidated to form the risks and issues for the control project.

    比如来自子项目风险问题需要控制项目的风险和问题中整理

    youdao

  • Figure 1: Change control rigor increases as the project progresses.

    1随着项目进展变更控制严格性也在不断地加强。

    youdao

  • Quality initiatives must lead cost and schedule in the control of the project to satisfy the spirit of the CMM.

    质量活动必须使成本进度处于项目控制之下,满足CMM精神

    youdao

  • Adapting change control rigor during the project.

    适应项目期间变更控制严格性

    youdao

  • Prepare Rational Team Concert source control for the performance test project.

    性能测试项目准备RationalTeam Concert源码控制

    youdao

  • Prepare Rational Team Concert source control for the performance test project.

    性能测试项目准备RationalTeam Concert源码控制

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定