Plan project budget and control project cost;
编制项目预算,控制项目运行成本;
Prepare project management for some project, control project schedule, control project cost and down project risk.
参与部分项目的项目管理工作,把控项目进度,控制项目成本,降低项目风险;
The cost control in the construction phase is the key for construction enterprises effectively control project cost control.
施工阶段的成本控制是施工企业能否有效进行项目成本控制的关键。
Construction contract management is a central part of project management and also an important tool to control project cost.
施工合同管理是工程项目管理的核心,是控制工程造价的重要手段。
The case study indicates that the method proposed in this article can effectively plan and control project cost and schedule objectives.
实例研究表明,本文提出的方法可更好地计划和控制项目的费用及进度目标。
This thesis analyzes the characteristics of all phases of project-cost management, and the corresponding countermeasures to control project cost.
本文分析了工程造价管理的各个阶段及其特点并提出进行工程造价控制的相关措施。
The text expatiate the tenet and method that should be follow to control project cost during pre design and detailed design for construction section.
阐述了在初步设计和施工图设计阶段控制工程造价应遵循的原则与方法。
To evaluate and select a architecture design scheme of the commercial residential building is the key to control project cost of the real estate corporation.
商品住宅建筑设计方案评选是房地产企业工程成本控制的关键环节。
The paper aims to acquire precise cost which can be employed to estimate cost, control project cost and increase efficient use of capital in HIV and AIDS prevention and treatment.
目的在于测算合理的艾滋病防治工作成本,为测算艾滋病防治工作费用和控制成本,提高资金使用效益服务。
This article, through analyzing the importance of engineering cost control, brings forth a couple of measures to control project cost combined with the work experience of the author.
此文通过分析工程项目成本控制的重要性,并结合工作实践,提出控制项目成本的几项措施。
Project cost audit is an important part of project cost, and the necessary means to control project cost, this paper discusses problems in project cost audit and proposes approaches to solve them.
工程造价审核是工程造价的重要环节,是控制工程造价的必要手段,本文就工程造价审核中遇到常见问题,提出处理的办法,与大家共同探讨。
Cost and earned value: To maintain control over expenditures throughout the project lifecycle.
成本和盈利值:为了维护对整个项目周期开销的控制。
Quality initiatives must lead cost and schedule in the control of the project to satisfy the spirit of the CMM.
质量活动必须使成本和进度处于项目的控制之下,以满足CMM的精神。
But, enterprise is very weak in the aspects of cost control of engineering project management.
但是,企业在工程项目的成本控制管理方面却很薄弱。
The engineering project is the construction enterprise effectiveness of operation source and the cost control center.
工程项目是施工企业经营效益的源头及成本控制的中心。
Responsible for project cost and schedule control.
负责项目成本和进度控制。
These problems could make the software project lose control on quality, plan and cost and make bad result at last.
这些问题将会使软件项目在质量、进度、成本等方面失去控制,最终导致失败。
Technology and economic integration of project cost control is the most effective means.
技术与经济相结合是控制工程造价的最有效手段。
In this Forum, we will emphasize on sharing how to realize various kinds of potential cost saving in business travel management project, and strategies to optimize business travel cost control.
这一论坛将重点分享如何实现商旅管理项目中各种潜在的成本节约,以及优化商旅成本控制的策略。
Three controls were usually emphasized in the engineering project implementation process: quality control, progress control and cost control.
工程项目实施过程中通常强调三大控制:质量控制、工期控制、成本控制。
Therefore, the high-speed railway construction enterprises must carry out the project cost control in order to ensure economic efficiency.
因此,高速铁路施工企业必须进行项目成本控制,才能保证经济效益。
The monthly cost analysis report, the recovery of the project funds, cost effective control.
审定月度成本分析报表,对各项工程资金的回收、开支进行有效控制。
They are designed to provide advisory services, project cost control, engineering and equipment, material bidding. project management consultancy services.
为所服务项目提供设计咨询,工程成本控制,工程及设备、材料招投标,工程项目管理等顾问服务。
In the process of contracting, these risks will produce a great influence on the project progress, its cost and quality control.
在工程承包过程中,这些风险因素都可能给工程进度、费用、质量的控制造成极大影响。
Ability to standardize and supervise project planning, cost control, project management and documentation carry out be project Managers.
推动项目管理标准化和有效监督项目团队的项目计划管理、成本控制、与档案建设和维护等事项。
The management and control of cost for a construction project are a dynamic process.
工程造价的控制与管理是一个动态的过程。
Take the effective management of the whole process of the project cost control is the key.
采取有效的全过程工程造价的管理控制是关键。
Below will from the project cost control system of project bidding and contract management aspects of some problems with this professional knowledge in this paper.
下面将从项目成本控制体系的项目投标和合同管理方面的一些问题结合本专业知识进行阐述。
Starting from the basic point of how to do well in cost control, the paper explores the general principles of project cost management and control.
本文就是从如何搞好成本控制的基准点出发,探讨项目中成本费用管理与控制的一般原则。
This article analyses and compares the problems existing in the cost control of the early stage, and it discusses a solution to control the project cost effectively.
本文分析、比较了当前我们在住宅建设的前期造价控制阶段存在的问题,针对这些问题提出了相应的解决方法,为更好、有效地控制工程造价提出了意见和建议。