• This paper analyzes the cause of civil-situ floor defect from the construction point of view, and put forward control measures to prevent casting slab defects.

    文章分析民用建筑现浇楼板缺陷产生原因,着重施工角度提出楼板产生缺陷防治措施

    youdao

  • In order to clean the bottom floor of engine room, the hot and cold fresh water pipes and cocks to be installed from engine control room to bottom floor.

    清洁机舱底部机控到底地板热水冷水旋塞

    youdao

  • Eventually he hauled himself back up and took the elevator to the top floor, where he entered the control room and inspected the damage from up high.

    最终又折回来通过升降来到顶层,然后进入控制室高处察看损害

    youdao

  • The operational process is that: simulating when receiving process plan from up-floor, manufacturing sequencing, allocating resource for works, sending control command, and controlling equipments.

    控制阶段,根据排序的结果工件分配加工资源根据调度的时间发送控制命令,控制命令通过各层的传送最后完成对底层设备的控制。

    youdao

  • The operational process is that: simulating when receiving process plan from up-floor, manufacturing sequencing, allocating resource for works, sending control command, and controlling equipments.

    控制阶段,根据排序的结果工件分配加工资源根据调度的时间发送控制命令,控制命令通过各层的传送最后完成对底层设备的控制。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定