• It models the basic process and only simple directed edges that control the flow of processing logic from one activity to the next.

    模型包括一些基本过程以及简单的有这些边框控制活动一活动的处理逻辑流程

    youdao

  • All manual assessment activity and control is kept in the existing claims process flow.

    所有人工评估活动控制保持现有索赔过程中。

    youdao

  • You can only add additional control flow inputs and outputs to an activity after dragging and dropping it into a reusing process model.

    将某个活动放到采用重用方法的流程模型中之后只能向该活动添加更多的控制输入输出

    youdao

  • Examine multiple occurrences of the same reused activity for redundancy and possible improvements of the control flow of the process.

    检查同一个被重用活动是否多次出现,以找出冗余以及是否有可能流程控制做出改进

    youdao

  • In case of a backward jump, the navigation continues at the target activity, and, as a result, some activities may be executed again, that is depending on the control flow.

    对于向后跳转导航目标活动继续执行结果可能再次执行某些活动具体取决于控制流。

    youdao

  • The same control flow is captured in Figure 7 using activity form.

    7采用活动形式捕获相同控制

    youdao

  • You can use gateway form and activity form interchangeably for process models that contain only control flow, as we discussed in the Background section in Part 1 of this article.

    流程模型中的网关形式活动形式可以互换使用本文第1部分中的背景部分所述。

    youdao

  • These operations will not be accepted unless the processPurchaseOrder activity is running and the flow of control has reached the two accept call actions.

    除非processpurchaseorder活动正在运行,并且控制流程已经到达两个接收呼叫行动,否则这些操作不会接收。

    youdao

  • Note that these operations will not be accepted unless the processPurchaseOrder activity is running and the flow of control has reached the two accept Call actions.

    注意除非processpurchaseorder活动正在运行,并且控制流程已经到达两个接收呼叫行动,否则这些操作不会接收。

    youdao

  • These operations will not be accepted unless the processPurchaseOrder activity is running and the flow of control has reached the two Accept Call actions.

    这些操作不会得到接受除非processPurchaseOrder活动正在运行而且控制流程达到两个AcceptCall 操作。

    youdao

  • First, you need to add an assign activity to your process control flow before the invoke activity (see Figure 10).

    首先,在调用活动之前需要将分派活动添加流程控制(请参见10)。

    youdao

  • UML activity diagrams can be used to describe the control flow of different abstract levels and are very suitable for modeling system behaviors.

    UML活动可以表示不同抽象控制适合用于系统行为建模

    youdao

  • Hepatic blood flow earlier perfusion phase, time-activity curve(TAC), hepatic blood pool phase(plane and tomography), CT and color ultrasound were compared as control group.

    再与血流灌注早期充盈、时间活性曲线TAC)、肝平面断层)显像、CT彩超检查作对照

    youdao

  • Hepatic blood flow earlier perfusion phase, time-activity curve(TAC), hepatic blood pool phase(plane and tomography), CT and color ultrasound were compared as control group.

    再与血流灌注早期充盈、时间活性曲线TAC)、肝平面断层)显像、CT彩超检查作对照

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定