• Connecting with practice introduce the leading idea and cost control method of cable TV connect into net. Put forward the design principle and give basic model about connecting.

    结合实际工作经验介绍农村有线电视接入网设计指导思想成本控制方法提出农村有线电视接入网的设计原则给出基本的设计模型。

    youdao

  • The paper deduces tangent stiffness matrix and set up geometrical nonlinear model of construction control calculation of the cable-stayed bridge.

    推演了索单元的切线刚度矩阵建立了斜拉桥施工控制计算几何非线性模型

    youdao

  • The simulation rule is presented to construct a simulation model for dealing with spatial conflicts control and combine-pouring of cable-cranes in Xiaowan Project.

    仿真规则处理空间冲突控制结合浇在小湾工程的电缆起重机构建一个仿真模型

    youdao

  • The utility model has the advantages of simple structure, high reliability, no external connecting control cable, replacement of the traditional connecting box and multi-function, etc.

    具有构造简单性能可靠、外接控制电缆可代替传统接线盒一多用等优点。

    youdao

  • The utility model is composed of a functional device, an operating rod, a movable joint, a control circuit box, and a cable wire.

    它由功能操纵杆活动控制电路电缆线构成;

    youdao

  • The utility model is composed of a functional device, an operating rod, a movable joint, a control circuit box, and a cable wire.

    它由功能操纵杆活动控制电路电缆线构成;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定