• Product inspection and test is control after the event because it occurs after the product is produced but before the product is released out of the organization's control.

    产品检查试验事后控制因为产品生产完成后,但却是在产品发行脱离组织控制之前进行的。

    youdao

  • The safety management system aims at the safety control before the in the event, and after the event. The structure and contents of the system are analyzed and discussed.

    信息系统为基础,旨在安全生产进行事前事中事后控制,并对体系结构内容进行分析和讨论。

    youdao

  • The safety management system aims at the safety control before the in the event, and after the event. The structure and contents of the system are analyzed and discussed.

    信息系统为基础,旨在安全生产进行事前事中事后控制,并对体系结构内容进行分析和讨论。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定