Product inspection and test is control after the event because it occurs after the product is produced but before the product is released out of the organization's control.
产品检查和试验是事后控制,因为是在产品生产完成后,但却是在产品发行脱离组织控制之前进行的。
The safety management system aims at the safety control before the in the event, and after the event. The structure and contents of the system are analyzed and discussed.
以信息系统为基础,旨在对安全生产进行事前、事中、事后控制,并对该体系的结构和内容进行分析和讨论。
The safety management system aims at the safety control before the in the event, and after the event. The structure and contents of the system are analyzed and discussed.
以信息系统为基础,旨在对安全生产进行事前、事中、事后控制,并对该体系的结构和内容进行分析和讨论。
应用推荐