This paper, combining a contract management system case, introduces the analysis and design of this development method. It effectively settles these problems.
本文结合一个合同管理系统的开发,给出了这一开发方法的分析与设计过程,有效地解决了这类问题。
Using "marketing contract management system" as example, the basic features and method of ACCESS 97 in development of application program were described.
以“销售合同管理系统”为例,讲述在应用程序开发中运用ACCESS 97的基本方法和特点,着重介绍该系统的设计与实现。
It Studies the organization pattern of project contract management, and proposed the method to establish contract management organization.
研究了对合同管理的效率有影响的工程合同管理的组织模式,并提出了设置合同管理组织的方法。
Sound management of the project procurement method can reduce the project cost to avoid contract disputes, ensure the payment schedule, and prevent corruption and waste.
健全的项目采购管理方法可以降低项目成本,避免合同纠纷、保证按期支付并防止贪污浪费。
In such background condition, risk management process and risk management method of the EPC general contract are studied systematically in this paper.
在这样的背景下,本文对EPC总承包模式的风险管理过程及风险管理方法进行了系统研究。
Compared with traditional DBB model, general contract gives new connotation and method of the design management.
对比传统的DBB模式,总承包模式给予设计管理新的内涵和方法,强调设计优选,设计的可施工性及设计沟通。
Compared with traditional DBB model, general contract gives new connotation and method of the design management.
对比传统的DBB模式,总承包模式给予设计管理新的内涵和方法,强调设计优选,设计的可施工性及设计沟通。
应用推荐