Pressure pumped CFG pile by continuous auger drilling is a new technology of CFG pile composite foundation.
长螺旋钻管内泵压CFG桩,是一项CF G桩复合地基新技术。
An auger is positioned within the chamber for moving crumb which has been charged to the chamber in a substantially, even, continuous manner along its horizontal longitudinal axis.
一个螺丝钻被放置在移动已经被收费到室的碎屑的室里面在一实质上,平坦的,连续的沿着它的水平纵观的轴样子。
An auger is positioned within the chamber for moving crumb which has been charged to the chamber in a substantially, even, continuous manner along its horizontal longitudinal axis.
一个螺丝钻被放置在移动已经被收费到室的碎屑的室里面在一实质上,平坦的,连续的沿着它的水平纵观的轴样子。
应用推荐