Supplementation and optimization of the original scheme were carried out and thus the construction period was shortened and good economic benefit was achieved.
在原设计方案的基础上,进行了补充和优化,由此缩短施工周期,取得了较好的经济效果,并为类似工程项目提供了施工经验和相关数据。
Finally, the Kuigang tunnel is discussed, which shows that this model is effective for construction scheme optimization and has the value for further study.
实践证明,这种模型很适合大型隧道工程的施工方案优化选择决策。
Finally, the Kuigang tunnel is discussed, which shows that this model is effective for construction scheme optimization and has the value for further study.
实践证明,这种模型很适合大型隧道工程的施工方案优化选择决策。
应用推荐