The bidding price as calculated per the volume of the construction project and the quantity of consumption of the major materials, including steel, wood and cement.
按照工程量清单计算的标价及钢材、木材、水泥等主要材料用量。
Many other factors affect the price of the project during construction.
其他许多因素都会在施工时影响项目的价格。
In the construction period of some flat earthwork deep hole blasting, the price of blasting materials was rising, so how to save the cost was the main problem faced the project.
某场平土石方深孔爆破施工期间,恰逢爆破器材价格上涨,如何节约爆破成本是此工程面临的主要问题。
The paper elaborates on the price formations of highway project bidding work, realize the effective control for it by managing design, supplies, purchase, construction.
阐述了公路工程招投标的价格形成,并通过对设计、物资采购、施工等的管理,实现对招投标价格的有效控制。
Construction enterprises should determine different strategies and offer skills of the project bid price quotation according to different circumstance when are bidding.
施工企业投标时可根据不同工程的具体情况,确定不同的投标报价策略和报价技巧。
The procedure and the method of tender price of domestic construction project tender are introduced systematically. Some tactics and skills in construction tender are brought forward.
系统的介绍了国内工程施工投标程序,介绍了建设工程投标报价的方法,总结了建设工程中的投标策略和投标技巧。
The properties of the rock-mass and soil-body in the dam area decide the price and cost of the project and have got the important influence to the safe construction of the hydraulic structures.
坝区岩土体的工程地质性质在很大程度上决定了水电工程的造价和成本,对水工建筑物的安全施工和运营有着重要的影响。
It is an important theory to discuss the functions of dealing mode of project biding in price forming of construction products from economic viewpoint.
工程招投标价格是建筑产品的市场价格,从经济学的角度探讨工程招投标交易方式在建筑产品价格形成中的功能是一个重要的理论问题。
The project tender blueprint provides which according to the party of the first part carries on the material calculation and the bid quoted price, provides the reasonable construction plan.
根据甲方提供的工程招标图纸进行材料核算与投标报价,提供合理的施工方案。
Unit price method is the fundamental one for calculating the output value of a construction project.
单价法是计算建筑工程产值的基本方法。
Construction enterprises should use corresponding price skills in the project bidding to win the bidding and obtain good economic benefits.
施工企业在工程投标中应采用相应的报价技巧,以达到既能中标,又能获得良好经济效益的目的。
At international bidding without base price takes the lowest tender price, it undoubtedly has very big function on standardizing the bidding and tendering of construction project.
国际上的无标底招标一般是最低价中标,它对规范建筑工程的招投标无疑有着很大的作用。
Project cost can be effectively controlled from the aspects of implementation, bidding, contract management, material and stuff price, construction supervision and project budget.
建设实施阶段,建设单位在招投标、合同管理、材料价格、施工管理(监理)、工程决算等几个方面,加强管理能够有效地控制工程造价。
Is the construction project tender bid price-marks "the reasonable low price"? This has become the owner and the contractor extreme issue of concern.
建设工程招标投标的中标价是否为真正意义上合理低价,以及如何界定它已成为业主和承包商极为关心的问题。
The direct meaning of project cost is the construction price.
工程造价的直意就是工程的建造价格。
The price management of project contracting has long been an important issue in the field of the construction management in our country.
工程项目的承发包价格管理长期以来一直是我国建筑工程管理领域的一个重要课题。
I probe into the control approach of the price of construction project from the micro respect.
笔者从微观方面探讨建设工程价格控制途径。
No environmental pollution, the price is cheap and so on, so in the construction of foundation reinforcement project are more widely application.
无环境污染,价格便宜等特点,故在建筑地基加固工程中应用较为广泛。
During large engineering project construction, the phenomenon which the low bid price often leads to high cost has its own inevitability.
工程项目建设过程中,低标价中标而最终导致高造价的现象有其内在的必然性。
Completion of the project, clearing, building construction enterprises to collect projects unit price basis.
工程竣工结算,是施工企业向建设单位收取工程价款的依据。
At project implementation stage, it also can reduce the uncertainty, create a steady, orderly working environment, and thus prevent redoing the same work and control the construction price.
在项目实施阶段,可减少项目施工过程中的不确定性,为项目创造稳定、有序的工作环境,从而防止返工浪费、控制工程造价。
Balanced error formula method is easier to operate price adjustment and draw the conclusion of practical price gap. It makes definite utilization of control for project construction quality.
采用差额公式法调价操作比较简单,可以很容易得出实际价差,对工程的施工质量起到一定的控制作用。
At present, the competition in the construction market is very drastic, and winning the bid at the low price is the general case. Therefore, the profit of the project relies on the management.
目前对外工程市场竞争非常激烈,一般情况是低价中标,因此工程就要靠管理来获得利润。
Occurred in construction, real estate development companies to conduct new project procedures, the project owner, the amount of guarantee payment of not less than 15% of the contract price.
发生过拖欠工程款行为的房地产开发公司办理新开工项目手续时,其业主工程款支付担保金额不低于承包合同价的15%。
Occurred in construction, real estate development companies to conduct new project procedures, the project owner, the amount of guarantee payment of not less than 15% of the contract price.
发生过拖欠工程款行为的房地产开发公司办理新开工项目手续时,其业主工程款支付担保金额不低于承包合同价的15%。
应用推荐