Through review of the construction process for Liansteel project, the effective measures for construction progress management of turnkey project were summarized.
通过对涟钢工程施工过程的回顾,总结提出了总承包项目施工进度管理的有效措施。
Network planning technique is an effective manner in construction project management which is popularized and applied widely on progress plan and management.
网络计划技术是施工项目管理中行之有效的一种管理方法,在进度计划与管理中得到了广泛地推广与应用。
Starting by the economic benefits and reputations, based on the actuality, the article analyzes the risk prevention of construction engineering projects, quality management and progress control.
文章从经济效益和社会信誉出发,结合工作实际,分析了项目工程施工的风险预防、质量管理与进度控制的内容。
The paper expatiates the management emphases and method of progress, quality and safety in the process of construction project building.
本文着重阐述了建设项目施工过程中对进度、质量和安全的管理重点及方法。
The theory and practice of realizing the plan progress control of basic construction process and tracing management with computer technology were introduced.
介绍了应用计算机技术实现基本建设过程计划进度控制和跟踪管理的理论及实践。
In combination with the wharf engineering practice, this paper introduces the construction progress, quality, costs and contract management of engineering projects.
结合码头工程实践,介绍工程项目的施工进度、质量、成本,以及合同管理经验。
But there are also a number of construction management issues, seriously affecting the quality of construction, progress and the construction of security.
但同时也存在着一些施工管理理由,严重影响了建筑施工质量、进度以及工程建设的安全性。
Road and Bridge construction site management is the core of construction management, site management effectiveness directly impacts project quality, progress and efficiency.
路桥工程施工的现场管理是施工管理的核心,现场管理效果的好坏直接影响工程的质量、进度和效益。
Importance of strengthening project technical management, and how to carry out quality, safety management, progress management, cost management and construction site management are elaborated.
本文论述了加强工程技术管理的重要性和怎样搞好质量管理、安全管理、进度管理、成本管理、施工现场管理的方法和步骤。
With the acceleration of infrastructure progress, effective control and management of the civil engineering construction progress is an important task in engineering management.
随着基建进程的加快,对土建工程的施工进度有效地控制与管理是工程管理中的重要工作。
Abstract: : on the road and bridge construction projects, management is the core part of project construction, a direct impact on project progress and project quality.
摘要:在路桥工程项目建设中,管理是工程建设的核心环节,直接影响到工程进度以及工程质量。
The paper introduces the scientific management in constructing in order to construct first-class project from construction progress, emigrant placement, project bids and construction management.
文章从施工进展、移民安置、招标工作、施工管理等方面介绍了为把尼尔基水利枢纽建设成一流工程,在施工中进行的科学管理。
Has made the obvious progress in construction management and the administration of the fund aspect, but also has many problems.
在施工管理和资金管理方面取得了明显的成果,但也存在不少问题。
Along with the rapid progress of PDL construction, the problem emerges concerning management of combined passenger transport among PDL, conventional line and other transport modes.
随着铁路客运专线建设的快速推进,必然带来客运专线与既有线、其他运输方式间的旅客联合运输管理问题。
'Progress' in modern project management is an integrated indicator combining systematically the engineering task, time limit, cost and resources and showing overall the construction status.
现代项目管理中的进度是一个综合的指标,它将施工项目任务、工期、成本、资源有机地结合起来,能全面反映项目的施工状况。
This text is from the progress management, quality management, safety management etc. synopsis discuss construction item construction management of point and method.
本文从进度管理、质量管理、安全管理等方面简要论述了建设项目施工管理的重点和方法。
For each project, the project manager will be the central point for the management of the construction progress and exercise of cost control precisely.
项目上,以项目经理为管理中心,全面推进施工管理和成本精打细算工作。
In construction management of expressways, the contractor to the control goal of the project progress, the project costs and the project quality is playing a very important role.
在高速公路建设过程中,承包商对工程项目的进度、费用、质量控制目标起着至关重要的作用。
At the same time, the lack of effective progress of optimization theory and methods of construction also restricts the construction management levels.
同时,缺少切实有效的施工进度优化理论与方法也制约着施工管理水平的提高。
In this paper, the results of research have a reference to the construction progress of the project management and its related owner.
本文的研究成果对业主及施工单位的工程进度管理工作具有一定的借鉴作用。
The traditional management method could not meet the requirements the project construction progress.
使用传统的手工管理难以适应工程进度的要求。
Therefore, the necessary to strengthen the construction of this kind of fire management, and progress to the material of the public scientific familiar, make scientific prevention.
因此,有关部分必需加强对此类建筑的消防治理,并进步公家对这些材料的科学熟悉,做到科学预防。
Cost control is an important component of cost management of the project, of which the most important implementation is to integrated control costs and the progress of the construction.
成本控制是项目成本管理的一个重要环节,在项目成本管理实施中最重要的控制要点就是对成本与进度的集成控制。
And the controlling methods and the key points of management during the preparatory stage and the construction stage are introduced including progress, quality, safety, cost, contract, informa...
介绍了施工前准备阶段和施工阶段中有关进度、质量、安全、成本和合同、信息、竣工的具体管理的控制方法和管理中的难点。
And the controlling methods and the key points of management during the preparatory stage and the construction stage are introduced including progress, quality, safety, cost, contract, informa...
介绍了施工前准备阶段和施工阶段中有关进度、质量、安全、成本和合同、信息、竣工的具体管理的控制方法和管理中的难点。