The basic requirement, craft process, and economic benefit adopting the concrete transport pump in construction have been stated in this paper.
浅谈在施工中,采用混凝土输送泵的基本要求,工艺流程及经济效益。
As key parts of the blast furnace, the bottom and hearth are characterized by complicated laying technique and construction process with high quality indices and strict design requirement.
炉底、炉缸是高炉的关键部位,砌筑技术及施工工艺比较复杂,质量指标和设计要求较高。
For HMA's requirement of high temperature, asphalt and aggregate need to be heated to high level in the process of construction.
HMA的拌和与施工温度要求很高,在生产过程中需要将沥青和集料加热到很高的温度。
The general construction process, material component and the basic operational requirement of the thermal insulation construction with cast styrene cystosepiment are presented.
针对挤塑聚苯乙烯泡沫板外保温施工流程概况、材料组成及基本操作要求简要阐述挤塑聚苯乙烯泡沫板外墙外保温的施工应用。
According to the requirement of the project, the construction and the process information object of actual production in 847 Plant, we analyzed the basic elements and the function construction model.
根据需求方案以及847厂的实际生产组织结构和工艺信息对象,分析了产品制造工艺管理信息系统的基本组织元素和功能结构模型。
Upon the construction progress and customer requirement, assign qualified technical personnel providing overall process site construction technical instruction and service .
根据工程进程情况及用户要求,可以派遣高素质技术人员提供全程现场施工技术指导和技术服务。
Upon the construction progress and customer requirement, assign qualified technical personnel providing overall process site construction technical instruction and service .
根据工程进程情况及用户要求,可以派遣高素质技术人员提供全程现场施工技术指导和技术服务。
应用推荐