• When it comes to demolishing buildings, there are two basic approaches: demolition without material separation, and selective reverse construction.

    拆除建筑物两个基本方法:只拆除进行材料分离选择性逆向建筑施工拆除。

    youdao

  • Xi 'an Lianhu Historic District as the "big demolition and construction," the wave of not only the basic dynamic of the large blocks, with a history of some of the basic block material.

    莲湖历史街区作为西安市大建”浪潮唯一基本大片街区,具有成为历史街区基本的一些物质条件。

    youdao

  • Xi 'an Lianhu Historic District as the "big demolition and construction," the wave of not only the basic dynamic of the large blocks, with a history of some of the basic block material.

    莲湖历史街区作为西安市大建”浪潮唯一基本大片街区,具有成为历史街区基本的一些物质条件。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定