SWEs write a lot of test code including test driven design, unit tests and, as we explain in future posts, participate in the construction of small, medium and large tests.
他们编写大量的测试代码,包括测试驱动设计(test driven design)、单元测试以及其它我们将要在后文中提到的内容,他们参与各种规模的测试构建。
Loading tests and displacement monitoring after construction indicate that these treatment methods got very good effects in this project.
通过施工后的载荷试验及位移监测,处理取得了非常良好的效果。
It is expected that the experiments may be helpful for tests, design and construction of the said connections.
期望通过此项研究,对今后类似的大型沉管隧道管段接头的试验、设计、施工有所帮助。
Structure can be analyzed and designed by using the axisymmetrical cylindrical shell theory with moment. A series of stress strain and displacement tests are carried out in situ construction.
利用轴对称圆柱壳有矩理论进行结构分析、设计,并在施工现场进行了一系列应力、应变和变形测试。
Many roadbed settlement observation tests are carried out to provide valuable data for littoral expressway design and construction.
许多公路部门都进行了规模较大的路基沉降观测试验工作,为沿海高等级公路设计与施工提供了可贵资料。
Author introduces the design key points, construction measures at some special joints, basement disposal, load tests, and construction effect of a gate scaffolding applied in a project.
介绍了某工程采用门式模板支架的设计要点,在一些特殊节点所采取的构造措施,基础处理和荷载试验,以及施工所取得的效果。
Tests show that the bolting method is simple in technology, easy for construction, lower in cost and reliable in safety with remarkable economic and social benefits.
试验证明该支护方法技术简单,施工方便,成本低,安全可靠,具有显著的经济效益和社会效益。
The tests provide available credible data for the subsequent design and construction.
试桩试验满足设计要求,为后期方案设计、施工提供了有效、可靠的参数。
Suide Soil and Water Conservation Experimental Station of YRCC conducted tests and study on probing and using the construction method of feldspathic sandstone as dam building material in 1997.
为探索利用砒砂岩作为筑坝材料的施工方法,黄河水利委员会绥德水土保持科学试验站于1997年进行了试验研究。
The detritus column vibroflotation is adopted to reinforce its foundation. The tests provide available credible data for the subsequent design and construction.
如果您是建设单位,我们可为您提供项目整体设计和施工指导,让你的工程全程无忧。
How to implement the simulation tests for the construction of complex structure in virtual environment so as to obtain optimized construction scheme and to train builders are presented in this paper.
本文研究了如何在虚拟的环境中实现复杂建筑施工的仿真试验,以获取优化的施工方案及对施工人员进行培训。
This article briefly introduces the construction, principle of work and property of clutch operated screw press, and mainly presents its major technical performance and tests.
简要介绍了离合器式螺旋压力机的结构、工作原理和特点,以及主要技术性能和试验。
A construction of single CCD camera large view field measurement system and its tests are briefly introduced.
介绍了单个CCD摄像机大视场测量方法系统的搭建及测试情况。
Analyzing the result data of the grouting tests, the writer raises some recommendations about construction process and parameters such as hole arrangement, hole row gap and grouting pressure.
通过对灌浆资料成果分析,对布孔形式、孔排距、灌浆压力等施工参数和施工工艺提出了建议。
Based on the detections of the construction process and the tests of the completed bridge, it is shown that the design and construction methods are reliable.
通过对施工过程的检测和成桥试验来验证设计和施工方法的可靠性。
Tests have been successful and construction is expected to begin early next year at a shipyard in Pennsylvania.
试验已经取得成功,估计将于明年初在宾夕法尼亚州的一个船厂开始建造。
Thermostat of high precision, stable and reliable, is the scientific research institutes, universities and colleges, construction unit test room, lab to do all kinds of tests necessary instrument.
恒温精度高,稳定可靠,是各科研院所、大专院校、施工单位等试验室、化验室做各种试验的必备仪器。
Real time monitoring and inspecting are conducted during construction; improving effects are detected through pore water pressure, layer settlements and plate load tests etc.
该工程施工与现场实时监测相结合,利用孔隙水压力、土体分层沉降和载荷试验等检测指标对加固效果进行了监测和检测。
After accomplishment of the construction of cutoff wall, water pressure tests and quality inspection were conducted, and the results indicate that the dam meets the anti-seepage request.
防渗墙施工结束后,进行压水试验和质量检查,满足主坝防渗要求。
In static loading tests of this project, engineers adopted the self-balance method and solved construction problems successfully.
该工程的静载试验采用了自平衡法,成功解决了工程难题。
The paper discussed common problems of pipe roof support engineering in soft ground and presented the optimization technology by tests on borehole construction methods with existing equipments.
在软弱土层管棚支护工程中,利用现有设备试验了多种成孔方法,优选出最佳成孔法,加快了工程进度。
This paper introduces the construction, technical parameters and industrial tests of this kind of drill.
本文介绍了该钻机的结构、技术参数和工业性试验情况。
All previous field vane tests and laboratory tests of Duhu construction and a power plant sea dike construction were collected and summarized.
收集和整理了某电厂海堤工程和杜湖工程历次现场十字板试验和室内试验成果。
Pilot tests were made on the improvement of source water quality in Taihu Lake through the construction of an aquatic and artificial media ecological system.
通过构建水生动物-人工介质新型生态系统来研究太湖水源地水质改善效果。
In addition, tests with this machine in a sewage water treatment plant are also de-scribed. Test results show that its construction is reasonable and its design is successful.
另外,还介绍了该机在污水处理厂中的试验情况,试验结果证明该机的结构是合理的,设计是成功的。
Based on the detections of the construction process and the tests of the completed bridge, it is shown that the design and const...
通过对施工过程的检测和成桥试验来验证设计和施工方法的可靠性。
The tests show part of the waste stone dust instead of sand can improve workability of mortar, reduce mortar contraction and increase compression strength. It is of advantage for construction.
试验表明,废石粉部分取代砂,可以改善砂浆的和易性,减少砂浆收缩,提高抗压强度并有利施工。
The tests made before and after the construction show that this technology has a good effect on reinforcing the foundation and eliminating the soil liquefaction.
振动沉管碎石桩用于处理液化土地基具有诸多优点,文章通过一工程实例介绍了振动沉管碎石桩的设计要点,施工方法,质量检测及处理效果等。
The tests made before and after the construction show that this technology has a good effect on reinforcing the foundation and eliminating the soil liquefaction.
振动沉管碎石桩用于处理液化土地基具有诸多优点,文章通过一工程实例介绍了振动沉管碎石桩的设计要点,施工方法,质量检测及处理效果等。
应用推荐