• The foundation soil in connection section on southern bank is mainly composed of loess. At the south of section marked 1+200, there is …

    南岸连接段地基土主要由黄土组成,在桩号1+200以南存在一层软塑状土,强度低,是影响渠坡稳定的关键性土层。

    youdao

  • In the power transmission device, fatigue of materials of the connection section is suppressed and torque is accurately interrupted at a target interruption torque value.

    在本发明的动力传递装置中,可抑制连结部的材料产生疲劳,从而以目标的切断转矩值正确地切断转矩。

    youdao

  • In the Properties TAB, specify the appropriate information in the Connection section.

    在Properties选项卡中,指定Connection部分的相应信息。

    youdao

  • In the Connection section, select twprocsvr_bus as the bus name from the drop-down list.

    在Connection区域中,从下拉列表中选择twprocsvr_bus作为总线名。

    youdao

  • In the Connection section, select twprocsvr_bus as the bus name from the drop-down list.

    在Connection区域中,从下拉列表中选择twprocsvr_bus作为总线名。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定