• Layered process Control (LPC) are a system of audits performed by multiple levels of management. Key process characteristics are audited frequently to verify process conformance.

    逐层过程管理(LPC)是由多个管理层进行的系统审核。对关键过程特性进行频繁的审核以验证过程符合性。

    youdao

  • The control service of IEC61850 has been implemented in protection device successfully, and it has passed the conformance test.

    将其应用于实际保护测控装置,实现了IEC61850标准的控制服务功能,并通过了一致性测试。

    youdao

  • The manufacturer shall control packaging, packaging and marking processes (including materials used) to the extent necessary to ensure conformance to specified requirements.

    制造业者应对包装、装箱及标识过程(包括所用材料)作必要的控制确保符合规定要求。

    youdao

  • Valve Body, Cover, Tailpiece and Control Stop shall be in conformance with ASTM Alloy Classification for Semi-Red Brass.

    阀体、阀盖、附属件和控制止回阀均符合美国材料试验协会ASTM的半红铜合金分类标准。

    youdao

  • Certificates of business place: lease contract, certificate of property title, fire-control conformance certificate, environment conformance certificate.

    场地证明:租赁合同、产权证明、消防合格证、卫生合格证、环保合格证。

    youdao

  • Does the supplier control packing, preservation and marking processes to ensure conformance to specified requirements?

    供应商是否对包装,存储和标识进行管控,以满足规格要求。

    youdao

  • The performances of linearity, function conformance, and short circuit between turns have the direct effect on the applications of the potentiometer in automatic control and instrument systems.

    精密线绕电位器的线性精度、函数符合度、匝间短路等项技术指标的优劣,直接影响到它在自控系统和仪器仪表中的应用,需要在生产过程中进行精确的参数测试。

    youdao

  • Quality control during construction consists largely of insuring conformance to these original design and planning decisions.

    施工过程的质量控制,由大量的确保符合原先的设计和规划的决定。

    youdao

  • Quality control during construction consists largely of insuring conformance to these original design and planning decisions.

    施工过程的质量控制,由大量的确保符合原先的设计和规划的决定。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定