• The Manufacturer must at all times during the manufacturing process conduct its own inspections to ensure the manufacturing is meeting the Product Specification Sheet.

    生产商必须在生产过程中时时派人跟踪,保证按产品规格单进行生产。

    youdao

  • Does factory conduct "pilot-run", review product quality against specification sheet and document results with corrective actions prior to production?

    工厂是否进行“试运行”,检讨对产品质量的规格表和文件在纠正行动之前生产?

    youdao

  • By the use of this cell sheet detaching agent, cultured cells adhering to a container surface can be detached without causing any cell damaging and without the need to conduct temperature control.

    根据该细胞片剥离剂,不会对细胞造成损伤,无需进行温度控制,可以将附着于容器表面的培养细胞剥离。

    youdao

  • By the use of this cell sheet detaching agent, cultured cells adhering to a container surface can be detached without causing any cell damaging and without the need to conduct temperature control.

    根据该细胞片剥离剂,不会对细胞造成损伤,无需进行温度控制,可以将附着于容器表面的培养细胞剥离。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定