The substructure is formed by the repetition of a modular prefab concrete element. This plinth frames and delimits the plot.
建筑的次结构是由预先制造的模具混凝土元素不断重复构成的,这些柱基将场地框定限制。
The substructure is formed by the repetition of a modular prefab concrete element. This plinth frames and delimits the plot.
建筑的次结构是由预先制造的模具混凝土元素不断重复构成的,这些柱基将场地框定限制。
应用推荐