Gucheng bridge is a steel tube concrete bowstring arch and variable cross section continuous beam composite system through bridge with single load plate.
古城大桥是一座下承式单承载面钢管混凝土系杆拱与变截面连续梁组合体系桥梁。
Using a spatial composite finite element method, combining three-dimensional solid element and bar element, the mechanical analysis of a two-span curved PC continuous box girder bridge is conducted.
采用三维实体单元和杆单元相结合的空间组合有限元方法,对一座两跨曲线预应力混凝土箱形连续梁桥进行空间受力分析。
In the continuous composite beam bridge, the difference in type, arrangement area and arrangement space of shear connectors will cause variation in mechanical characteristics of the structure.
在连续组合梁桥中,剪力键的类型、布置范围和布置间距的差别将引起结构受力特性的差异。
Based on the continuous girder bridge completed conventional design on the basis of content, a more detailed analysis of the composite structure in the design of the bridge four key issues.
本文在结束连续梁桥向例设计实质的根底上,较仔细地分析了组合结构桥梁设计中的四个关键问题。
Negative bending moment nearby the middle supports of composite steel-concrete continuous beam bridge, will cause floor deck concrete to crack and shorten its life.
钢-混凝土组合连续梁桥的中间支座附近为负弯矩区,会导致桥面混凝土开裂,缩短使用寿命。
In this paper, some design principles and construction methods of a new type composite continuous beam bridge with partially prestressed concrete have been put forward.
本文提出了一种新桥型——部分预应力混凝土组合连续梁桥的设计原理与施工方法。
Zhanjiang Bay bridge is a 5 span continuous composite cable stayed bridge of floating system across Maxie straits.
湛江海湾大桥是跨越麻斜海湾的五跨连续漂浮体系混合梁斜拉桥。
Zhanjiang Bay bridge is a 5 span continuous composite cable stayed bridge of floating system across Maxie straits.
湛江海湾大桥是跨越麻斜海湾的五跨连续漂浮体系混合梁斜拉桥。
应用推荐