The steam generating plant consists of one (1) composite boiler.
蒸汽发生装置由1台组合式锅炉组成。
Seeing that ion exchange process for treatment of boiler feed-water is of high cost and difficult to master, composite antiscale KH- 209 is developed and prepared.
针对采用离子交换法处理锅炉用水时费用高且技术难以掌握等问题,研制开发了KH-209复合阻垢剂。
In this paper the design and analysis of composite floor structure in the boiler workshop which belongs to the 3rd enlargement to Mudanjiang 2nd Electrical Power Plant are presented.
本文介绍了牡丹江第二发电厂三期扩建工程锅炉运转层组合楼盖结构的设计与分析。
In this paper the design and analysis of composite floor structure in the boiler workshop which belongs to the 3rd enlargement to Mudanjiang 2nd Electrical Power Plant are presented.
本文介绍了牡丹江第二发电厂三期扩建工程锅炉运转层组合楼盖结构的设计与分析。
应用推荐