• The problem of three-dimensional seepage analysis for the complex rock foundation is less frequently studied so far at home and abroad.

    复杂岩基渗流分析问题目前国内外研究少。本文提出了一个以电网络法基本求解手段分析方法。

    youdao

  • The dam foundation engineering geological problem is the bed rock deep weathering in Malutang water complex.

    马鹿水利枢纽坝基主要工程地质问题就是基岩风化问题。

    youdao

  • The mechanical properties of columnar jointed rock mass, which is the main composition of dam foundation and surrounding rock of deep cavern at Baihetan hydropower station, are very complex.

    白鹤水电站坝基基岩深部洞室围岩以柱状节理岩体为主力学特性极其复杂

    youdao

  • The mechanical properties of columnar jointed rock mass, which is the main composition of dam foundation and surrounding rock of deep cavern at Baihetan hydropower station, are very complex.

    白鹤水电站坝基基岩深部洞室围岩以柱状节理岩体为主力学特性极其复杂

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定