Abstract: : the karst is strongly developed in Dazhiping tunnel, where the hydrogeological condition and geological structure is complex, so the construction is difficult.
摘要:大支坪隧道岩溶发育强烈,水文地质条件和地质构造复杂,施工难度大。
Abstract: : the karst is strongly developed in Dazhiping tunnel, where the hydrogeological condition and geological structure is complex, so the construction is difficult.
摘要:大支坪隧道岩溶发育强烈,水文地质条件和地质构造复杂,施工难度大。
应用推荐