In most cases, subsequent depth measurements, such as those made during the well completion phase, are corrected to the wellhead datum that is based on drillers depth.
在大多数情况下,随后的测量(如在完井阶段所进行的测量)都被校正至基于司钻深度的井口基准面。
Cost control runs through the whole process of construction projects. The cost control measures of design phase, bidding phase, construction phase and completion phase of construction are described.
造价控制贯穿于工程项目建设的全过程,阐述了设计阶段、招标投标阶段、施工阶段和竣工阶段控制工程造价的措施。
The activities of the TMap Completion phase and its RUP counterparts are shown in Table 6.
TMap完成阶段的活动及其与RUP的对照如表6所示。
The activities of the TMap Completion phase and its RUP counterparts are shown in Table 6.
TMap完成阶段的活动及其与RUP的对照如表6所示。
应用推荐