To assist the Client to execute the Completion Acceptance.
协助委托人进行竣工验收工作;
Following technical materials should, by contractor on the date of project completion acceptance, be provided to employer.
施工单位应当在工程竣工验收合格之日向建设单位提供下列技术资料。
The employer shall not use the project that not carrying out completion acceptance or the completion acceptance hasn't been passed yet.
工程未经竣工验收或竣工验收未通过的,发包人不得使用。
Responsible for the project from construction preparation to completion acceptance, the whole process of construction management and settlement.
负责工程项目从工程施工准备开始直至验收交工,以及签证结算的全过程施工管理工作。
Report of quality evaluation for unit project is a important content in supervision works and it is also a important part in completion acceptance information.
单位工程质量评估报告是一项重要的监理工作内容,也是竣工报验资料的重要组成部分。
Its construction activities from equipment procurement start and involves installation, commissioning, operation, completion acceptance stages, until meet use function or normal production so far.
其施工活动从设备采购开始、涉及到安装、调试、生产运行、竣工验收各个阶段、直至满足使用功能或正常生产为止。
Prior to completion and acceptance of works, sets of data on pile foundation construction shall be prepared early and signatures of name can not be lost according to the copies of documents submitted.
在竣工验收之前,根据规定需提交的资料份数,提前整理好桩基施工的成套资料,所有必须签署姓名的地方不得遗漏。
In the process of setting the reference point, we must carefully check the location of the layout point, do a good job of record and identification, and facilitate the completion of acceptance.
基准点设置过程中,一定要仔细核对布置点的准确位置,做好记录和标识,便于进行竣工验收。
All data for completion and acceptance of project shall be complete without loss, especially for pile-made data as quality guarantee of materials, acceptance certificate and test report.
对于竣工验收必备的所有资料必须准备齐全,不得遗漏,特别是制桩资料,如各类材料的质保书、出厂合格证与检测报告等。
Start date the best book for "from the buyer after receiving calculated from the date of inspection, acceptance, enable" or "calculation" as of the date of completion of installation and debugging.
起始日期最好订为“从买方收货后检验、验收、启用之日起计算”或“安装调试完毕之日起计算”。
Upon completion of the donated public welfare project, the donee shall inform the donor of the construction, use of the funds and checking and acceptance of the construction quality.
捐赠的公益事业工程项目竣工后,受赠单位应当将工程建设、建设资金的使用和工程质量验收情况向捐赠人通报。
Including Successful Completion of the acceptance Tests and correction of defects or deficiencies in accordance with the terms and conditions hereof.
包括验收测试的成功完成以及按本合同条款和条件对瑕疵或缺陷进行纠正。
QHSE Dept. : be responsible for the project's quality control management, final inspection and acceptance of construction of all processes, reorganize completion data, etc.
QHSE部:负责工程质量控制管理,各工序施工终检、验收,竣工资料整编等。
We must ask why the company did not pass completion and acceptance of environmental circumstances, we can start producing offense.
我们首先要问,为什么该公司在未通过环保竣工验收的情况下,就能够违法开始生产。
After completion of establishment of the planned retailer, the applicant shall apply to the original approving department for acceptance inspections.
申办人完成拟办企业筹建后,应当向原审批机构申请验收。
The "Sound Steward" service ZISEN pioneered covers every phase from project approval, investigation, design, construction, completion and acceptance.
声学独创的“声管家”服务,从项目立项科研阶段-项目设计阶段-项目施工阶段-竣工验收阶段。
The completion of the production of finished product acceptance, payment of procurement progress models.
制作完成进行成品验收,支付采购进度款。
A delivery receipt acceptance certificate or completion certificate that is sufficient to prove the completion of the contracted activity under the preceding item.
签收单、验收单或完工证明,足以证明完成第一款之契约行为者。
Acceptance: the completion of the project will be undertaken by company representatives and owners of common acceptance.
工程验收:完成的工程将由公司代表和业主的共同验收。
Methods It is based on the acceptance rate, completion rate and time consuming to assess the feasibility of the instrument.
方法可行性采用量表接受率、完成率和完成时间评价。信度检验用内部一致性信度、分半信度评价。
Abstract: Construction engineering Technic material is the completion of the project completion and acceptance of the important basis of quality grade evaluation.
摘要:建筑工程施工技术资料是工程完成后竣工验收评定质量等级时的重要依据。
Registrar refers to the entity authorized by CNNIC and responsible for acceptance of the domain name registration applications and completion of domain name registrations.
域名注册服务机构:指经中国互联网络信息中心授权,负责受理域名注册申请并完成注册的机构。
Model acceptance test is applied to accept Yantan turbine performances. The model efficiency maximum is 92 percent in the completion of similar prototype.
岩滩水电站水轮机性能采用模型验收试验方式验收。其全模拟模型最高效率达到92%。
Article 2 These Measures are applicable to the completion-based check and acceptance of newly-built and rebuilt port projects.
第二条本办法适用于新建和改建的港口工程竣工验收活动。
"All the home studio of a designer, Some owners in the design of advanced call on" properties "in the views and in the works are nearing completion, the" master "acceptance."
全美家居工作室的一位设计师说,有的业主在设计时就先期请“风水师”介入意见,也有的是在工程即将完工时请“大师”验收。
Audit after the event is the key link of follow-up audit, including the acceptance test of completion of a project and the examining and approving of the cost of house repairing engineering.
房屋修缮工程审计是高校内部审计的重要内容之一,而跟踪审计又是高校房屋修缮工程审计的基本方法。
The order shall be deemed as acceptance after completion of Seller's signature on the buttom hereof and submittal of Seller's PROFORMA INVOICE with the signed page to Buyer.
卖方在此底部签名后, 将报价单连同签名页面交与买方,订单即视为被确认。
The order shall be deemed as acceptance after completion of Seller's signature on the buttom hereof and submittal of Seller's PROFORMA INVOICE with the signed page to Buyer.
卖方在此底部签名后, 将报价单连同签名页面交与买方,订单即视为被确认。
应用推荐