The intent is that all of the work committed is completed, no matter what comes up, so choose a percentage of slack that fits your team.
其意图就是不管发生了什么事情,所有计划好的工作都需要完成,所以选择空间百分比以满足团队这个需要。
Figure 7 shows, for a sequence of days, the percentage of the builds which have successfully completed and passed automated testing.
图7中展示了在一段连续的时间内,已经成功完成并通过自动化测试的构建的百分率。
Analysis was preformed and calculations as a percentage of estimated improvements on a discipline-by-discipline based were completed. The details of the calculations are as follows.
按照不同领域的估计改进百分比的分析和计算已经完成。
Using the Rational Insight solution, you can roll up trace coverage with the metadata to gain visibility into reporting the percentage completed on the tasks outlined above.
使用RationalInsight方案,您可以将追踪范围与元数据联系起来,以获取关于以上任务完成情况的报告。
It shows constant animation to indicate something is going on, but it doesn't indicate what percentage has completed.
它显示固定的动画以表明有些事情正在发生,但是它不表明完成的百分比。
For example, the linear feet of piping installed can be compared to the required amount of piping to estimate the percentage of piping work completed.
例如,将已安装的直线管道和须要装置的管道数量进行比拟便可测算出已完工管道劳动量的百分比。
It was found that as the magnitude of the low bid increased, the resulting completed project cost tended to increase absolutely and as a percentage of the original bid.
人们已经发现如果低出价的投标额增加,完工项目的成本绝对会随之而增加,并且与原有的出价之间存在相应的百分比关系。
It was found that as the magnitude of the low bid increased, the resulting completed project cost tended to increase absolutely and as a percentage of the original bid.
人们已经发现如果低出价的投标额增加,完工项目的成本绝对会随之而增加,并且与原有的出价之间存在相应的百分比关系。