• As the main material in constructing compacted rockfill dam, the engineering properties of rockfill have a vital effect on DAMS security.

    石碴作为堆石坝主要筑坝材料,工程性质对堆石坝安全性至关重要影响

    youdao

  • In recent concrete face rockfill dams (CFRDs), small deflections have been achieved by forming a well-compacted rockfill embankment and through careful design and construction of all details.

    近年来,通过筑坝时充分压实精心设计实现混凝土面板堆石坝变形目的。

    youdao

  • The compacted rate method is worked out for quality control of earth-rockfill dam and the data for calculating the compacted rate are acquired by GPS.

    研究了基于GPS的压控制法在碾压质量控制中的应用,利用GPS采集数据经过计算得到压实率,然后通过压实率来控制碾压质量。

    youdao

  • The compacted rate method is worked out for quality control of earth-rockfill dam and the data for calculating the compacted rate are acquired by GPS.

    研究了基于GPS的压控制法在碾压质量控制中的应用,利用GPS采集数据经过计算得到压实率,然后通过压实率来控制碾压质量。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定