End of the commissioning procedure.
委托创作流程结束。
The commissioning procedure shall be witnessed at one of the first wind turbines built in the version to be certified (see Section 10.8).
调试程序应该在第一个风机(按照待认证的风机版本建造)上进行验证(见第10.8节)。
Commissioning procedure and outline: Steam blowing commissioning procedures already finish. Commissioning outline and other commissioning procedures are in process.
方案和调试大纲:吹管方案已经编写完毕,调试大纲正在编写中。
Standardized startup procedure and attributes support the use of commissioning tools in a multi-vendor environment.
标准化的启动过程和属性支持调试工具在多厂商环境中的使用。
Once completed the site verification for LUN, the Permit Coordinator will verify and accept the commissioning PTW based on his previous two days of site inspection (See LUN procedure).
经过现场准备工作完成情况的确认(参看试验通知环节)。
Once completed the site verification for LUN, the Permit Coordinator will verify and accept the commissioning PTW based on his previous two days of site inspection (See LUN procedure).
经过现场准备工作完成情况的确认(参看试验通知环节)。