This paper analyzed the effect to structure aroused by differential settlement of underground continuous wall and column pile.
分析了围护结构和立柱桩差异沉降对于车站结构的影响。
The shearing force and overturning moment of column is reduced, and the shear force and moment at the top of pile is decreased compared with linear interaction system.
与线性相互作用体系相比,柱的剪力和倾覆力矩减小;桩顶的剪力和弯矩也有所减小。
In this paper, the bridge's pier column of double columns bored pile makes internal force calculation.
本文针对某桩柱式桥梁,对其墩柱进行内力计算。
The causation for column foundation settlement of factory building is analysed in this paper' Therefore, the scheme of reinforcing foundation with chemical churning pile has been put up.
分析了某厂房柱基础沉陷事故的原因,提出采用旋喷桩进行加固处理的方案。
Failure surface shape of pile tip and ultimate tip resistance was obtained according to Mohr-Column failure criteria.
根据莫尔-库仑破坏准则得出了桩端的破坏面形状以及极限端阻力。
Designers may refer to the design-calculation methods which are suggested in this thesis in terms of double-column combined shallow foundation and double-column combined pile caps.
论文提出的双柱联合浅基础和双柱联合桩基承台的设计计算方法可供工程设计人员参考。
Column pier comprised pile cap, pier body and cap beam, pier column and pile found is as an important part of the bridge.
柱式桥墩由承台、柱式墩身和盖梁组成,墩柱和桩基是桥梁的重要组成部分。
A brief introduction is given to the structural design scheme and application of combination column for dock pile foundation of Jiangmen National Grain Reserve Storage dock Engineering.
简要介绍江门市国家粮食储备库码头工程的结构设计方案,组合桩在码头桩基的应用等特点。
Based on Caishikou Station engineering of Beijing Metro Line 4, construction plan demonstration, technology measures and test technology about pile foundation of steel pipe column are introduced.
基于北京地铁四号线菜市口车站工程,介绍了钢管柱桩基的施工方案论证、技术措施和检测试验技术。
Column pier is made up of pile cap, pier body and cap beam, pier column is an important part of the pier.
柱式桥墩由承台、柱式墩身和盖梁组成,墩柱是桥墩的重要组成部分。
In this paper, the bridge 's pier column and pile foundation perform reinforcement design and checking.
本文针对某桩柱式桥梁,对其墩柱和桩基进行配筋设计和强度验算。
Therefore the building prefabricated circular pipe pile of the utility model can be used for not only underground foundation but also above-ground building column.
因此本实用新型建筑预制圆管桩既可被用作地下的基础部分,也可同时作为地面上的建筑物的立柱。
By means of practical project, this paper explore the method using the united pile-foundations under the column to disposal of the pile-foundation translation.
本文结合工程实例,探讨采用柱下联合承台处理桩基移位的方法。
The steel column base of National Stadium is anchored in reinforced concrete pile cap, whose stress state is complex, and similar experiments were few in the past at home and abroad.
通过对苏通大桥承台封底混凝土与钢护筒间握裹力的试验研究与施工现场检测,提出钢护筒与承台封底混凝土间的握裹力系数。
The steel column base of National Stadium is anchored in reinforced concrete pile cap, whose stress state is complex, and similar experiments were few in the past at home and abroad.
通过对苏通大桥承台封底混凝土与钢护筒间握裹力的试验研究与施工现场检测,提出钢护筒与承台封底混凝土间的握裹力系数。
应用推荐