Let's discuss the Linux client migration in which back-end servers have not yet been migrated.
我们来讨论在还未迁移后端服务器的情况下的Linux客户机迁移。
These factors are especially important in a client migration project because users are affected in such a direct way.
这些因素对于客户机迁移项目尤其重要,因为用户会受到直接影响。
This article focuses on the starting point of a client migration: that is, the organizational planning and especially the user segmentation.
本文主要讨论客户机迁移的起点:即组织规划和用户分类。
Another advantage is that the actual migration process occurs on the NIM master, taking the load off the client LPAR.
另一个优势是,实际迁移过程在NIM主机上进行,消除了客户机LPAR上的迁移负载。
Making the migration from a client perspective to using the Exchange protocol with a mail-client solution, such as Evolution or Akonadi, is a simple proposition.
将客户端迁移到通过一个邮件客户端解决方案(比如evolution或akonadi)使用Exchange协议是一个简单的提议。
Because IBM values customer feedback, the DAMO development engineers have implemented feature enhancements in the DAMO client, and in the Domino Migration Tool, to meet your requests.
因为IBM很重视客户的反馈,所以DAMO开发工程师们实现了DAMO客户机以及DominoMigrationTool中的一些特性增强,以满足您的需求。
It will guide you through the steps of Microsoft Exchange migration and installation and configuration of the DAMO client with no previous knowledge required.
本文将引导您完成MicrosoftExchange迁移的步骤,安装和配置DAMO客户机,无需以前就具有这方面的知识。
So back to the beginning question, look at your company or client and ask yourself, Is there a SharePoint project or a business process, migration or a custom application projects.
那么回到开头的问题,审视你的公司或者客户,问问你自己,是否存在一个SharePoint项目或者一个业务流程、迁移或者自定义应用项目。
Figure 5 shows the "Add local client views" page in the J2EE Migration wizard.
图5在J2EEMigration向导中显示了“图5 .添加本地客户端视图”页。
The 6.5.4 release promises enhanced integration between the Domino Migration Tool and the DAMO client, and a key component of that integration is improved contacts migration.
版本承诺增强DominoMigrationTool与DAMO客户机之间的集成,该集成的一个关键组件是改进的联系人迁移。
This article guided you through the most important technical considerations involved when introducing a Linux client in your organization and when planning for your migration pilot phase.
本文介绍了在企业中引入Linux客户机和规划实验性迁移时涉及的最重要的技术问题。
Although the migration was done in a relatively short time, I am convinced that the client would not have been able to succeed on their own (R7).
尽管此次移植在一段相对较短的时间内完成了,但是我确信客户还是不能独自成功的完成这一操作(R 7)。
On a recent migration project, the client had a huge code base that took advantage of a number of violations of the EJB specification that the other application server happened to permit.
在最近的一个迁移工程中,客户机上有一个大量地违背EJB规范的庞大的代码库,而另一个应用服务器应用服务器允许这些对规范的违背。
Support for client side and server side data migration for convenience.
方便地支持客户端与服务器端的数据迁移。
That flexibility of the tool recently came in handy in a similar migration project for another client.
工具的灵活性对于其他客户的类似移植项目来说唾手可得。
This migration effort took place in the context of a requirements management workshop with a client that used Microsoft Word for requirements management.
这个移植努力发生在需求管理工作场所的环境中,客户使用MicrosoftWord进行需求管理。
Copy the CQTM2RQMMigration.zip file from <install directory of RQM>\migration folder to a temporary folder on the Rational ClearQuest test manager client machine.
将 CQTM2RQMMigration.zip文件从<installdirectoryofRQM>\migration文件夹复制到RationalClearQuestTestManager客户端机器上的一个临时文件夹中。
On the VIOS you'll find messages relating to the suspension of the LPAR and the migration status (Client partition suspend issued and migration completed successfully).
在VIOS上,会找到与VIOS的暂停和转移状态相关的消息(Clientpartitionsuspendissued和Migrationcompletedsuccessfully)。
On the VIOS you'll find messages relating to the suspension of the LPAR and the migration status (Client partition suspend issued and migration completed successfully).
在VIOS上,会找到与VIOS的暂停和转移状态相关的消息(Clientpartitionsuspendissued和Migrationcompletedsuccessfully)。
应用推荐